FMEA - (Failure Modes and Effect Analysis)

  Рет қаралды 993

Learn Lean

Learn Lean

Күн бұрын

Пікірлер: 12
@VinDe1216
@VinDe1216 Жыл бұрын
First Like 😊
@learnkaizen
@learnkaizen Жыл бұрын
and so much appreciated!
@donedilated
@donedilated Жыл бұрын
Appreciated, what I would love to see is a true life example from an manufacturing environment
@labidiamani3336
@labidiamani3336 26 күн бұрын
Thanks its very helpful 🎉❤
@abhinavpachpute355
@abhinavpachpute355 Жыл бұрын
Thank you for your awesome content!
@ausgod_
@ausgod_ Жыл бұрын
This video dropped at the right time was thinking of doing one at work
@learnkaizen
@learnkaizen Жыл бұрын
Awesome! Sometimes the stars just align. Be sure to ask questions here in the comment section if you have questions as you get into it.
@snobgoblinDK
@snobgoblinDK Жыл бұрын
Very similar to a risk analysis from project work
@Abhisheksingh-rw2rg
@Abhisheksingh-rw2rg Жыл бұрын
Sir, Thanks for sharing . There are different type method/tools of RCA. Pls share a video on them, their limitations, benifits & specific uses. Currently I am using Why-2 analysis & fish bone diagram ( 4M) which is not enough for all types of problems. I had heard about FMEA, Now i got it 😊
@learnkaizen
@learnkaizen Жыл бұрын
Thank you for the video suggestion. I will add it to the line-up of videos I have planned for the remainder of the year. You are correct in stating there are multiple methods of RCA…I’ve personally used 8D, 5P, 7-Step, PSP, Kepner Tregoe and all the various tools that go along with those methods. I’ll put a video together to quickly run through the list + the difference between solving problems at the bowler level versus the tactical level.
@hambogumble4123
@hambogumble4123 Жыл бұрын
Considering that historical nugget and current zeitgeist, perhaps FMEA *may*have been utilised by the Manhattan project…
@learnkaizen
@learnkaizen Жыл бұрын
Maybe…I’d hate to be the one leading that FMEA…too many possible failure modes…one almost happened on the second trip (I believe it was the 2nd) where the bomb light activated meaning that it was armed. They quickly shut it down though…then there was the weather that forced the Nagasaki hit but the original target was Kokura (I believe)…none the less, I’d hate to be the one leading it due to the devastation more so than the failure modes. Appreciate the comment.
3-Tools for Your Next Kaizen (Pro-Level)
19:37
Learn Lean
Рет қаралды 2,8 М.
FMEA, the 10 Step Process to do an FMEA (PFMEA or DFMEA)
21:43
CQE Academy
Рет қаралды 249 М.
Kaizen Does Not mean Continuous Improvement (We ALL Were Wrong)
8:07
5-Truths About Root Cause Analysis (Learned from Japanese)
14:33
What is 5S in Lean (Plus 4 Pro Tips)
16:23
Learn Lean
Рет қаралды 4,5 М.
Think Faster, Talk Smarter with Matt Abrahams
44:11
Stanford Alumni
Рет қаралды 2,4 МЛН
Leading a Kaizen with ZERO Experience (A MUST WATCH)
15:11
Learn Lean
Рет қаралды 1,7 М.
Top Ten FMEA Mistakes
11:55
HarpcoSystems
Рет қаралды 66 М.
5-Tips for Lean Career Path (Wish I Knew 20 Years Ago)
11:00
Learn Lean
Рет қаралды 1,1 М.
How to Use Process & Value Stream Maps (for MAXIMUM Benefit)
14:01
5-Steps to a Kaizen Culture (with MODEL)
10:10
Learn Lean
Рет қаралды 1,6 М.