Рет қаралды 2,525
View a side curtain/ roll-up window install for a SolaWrap Greenhouse. Sidewall curtains are a breeze with Solawrap. Just slide the greenhouse plastic into the track/ extrusion get it done.
SolaWrap is the greenhouse cover with the bubbles. It has a 10-year warranty against UV degradation, a 1.7 R-Value, 83% transparency and light diffusion.
SolaWrap film stands up to 120 lbs per square foot of snow load which approximates 15 feet of snow!
Greenhouses covered in SolaWrap are still going strong with the original film after 30 years. It's" the one and done film"! www.solawrapfilms.com or call 760 597 9298- ask for a free sample packet. Happy Growing.
Visit www.globalplas...
Here are the install direction in an abbreviated version:
Measure your bow spacings- the distance between the supports.
You should be at 4,5,6 feet or 2 meter spacing. If this is not the case please make adjustments to the bows or add additional perlins to make this possible. (Call us we are here to help and give you options).
Unevenly spaced bows make your vertical installation difficult, but not impossible. (Again just give us a ring).
Measure your longest length run needed. This is how much material will be required for your structure. Please keep in mind that you can not successfully seam the material without loss of structural strength.
Rolls are sold either in custom lengths or as master rolls, which are 328 feet in length. **Please note that the first wrap around the rolls is not part of this count, it is given as additional protection during shipping, if your first layer is damaged, not to worry! It is not calculated in your material request.
Install tracks into your frame with self-taping screws (stainless or galvanized is recommended) 1 ¼” to 1 1/2 “ in length. Insert the Solawrap film into the tracks.
***Optional for Warmer Climates: It is suggested that a neoprene washer to added to the screw at the assembly to help spread the load and prevent the screw from heating up and melting through the extrusion. Screw spacing recommendation is 12” -24” apart depending on the wind, rain, and snow loads. For low snow load areas, 17” spacing is adequate. In high wind and snow loads, 12” spacing is recommend.
Tracking must be aligned properly or film could get damaged when inserted.
Tools and Equipment Needed For Solawrap Installation:
Sharp cutter/blade
Measuring tape
Marker
Self-taping screws (stainless or galvanized is recommended) 1 1/4-1 1/2“in length. ***Optional for warmer climates it is suggested that a neoprene washer be added to the screw at assembly to help spread the load, and prevent the screw from heating up and melting through the extrusion.
Ladders, and or scissor lifts
Drill or impact driver with 5/16 bit, or one of your choosing
Saw
2 work horses and a bar (at a minimum 1 foot longer than your film size.
Clear silicone, outdoor and waterproof (used for the connections between your extrusions.
Chanel lubricant, WD-40, soapy water etc