What-if the project finish date does not match with reflection schedule after merging updates?
@PJMScheduling
@PJMScheduling 9 күн бұрын
@@liaqatkamran6394 You'll need to be able to explain why there is a difference between the two files. Typically, it's because there were relationship or duration changes downstream of the delay event. If those helped mitigate the delay, that should be explained. If they exacerbated the delay, that should also be explained.
@everestakigwe1858
@everestakigwe1858 2 жыл бұрын
The link is no longer available. Can you please upload a new link? I'm pretty interested in this topic. Thanks!
@PJMScheduling
@PJMScheduling 2 жыл бұрын
Thanks for letting me know! The link has been updated and can also be found here: tools.pjmss.com/post/8D556D3D-0952-DFF4-3B43-1B6BC7F5D845
@srirammanian
@srirammanian 2 жыл бұрын
superb
How to Update a Cost Loaded Schedule in Primavera P6 - The Right Way
10:03
PJM Scheduling Services
Рет қаралды 6 М.
Creating an S-Curve from Primavera P6
14:37
PJM Scheduling Services
Рет қаралды 13 М.
VIP ACCESS
00:47
Natan por Aí
Рет қаралды 30 МЛН
Mom Hack for Cooking Solo with a Little One! 🍳👶
00:15
5-Minute Crafts HOUSE
Рет қаралды 23 МЛН
P6 Filters: Find the Driving Path to a Specific Activity (Float Path)
3:38
PJM Scheduling Services
Рет қаралды 5 М.
Create a Stacked Histogram in P6 from Daily Reports
17:04
PJM Scheduling Services
Рет қаралды 2 М.
Construction Project Schedule & Control - Appendix A - Assignment 5
15:11
PJM Scheduling Services
Рет қаралды 843
How to Build a P6 Schedule from Scratch - Part 11: Resource Assignments
10:54
PJM Scheduling Services
Рет қаралды 2,4 М.
THE FASTEST Way to Cost Load a P6 Schedule
6:53
PJM Scheduling Services
Рет қаралды 6 М.
P6 Filters: 4 Week Look Ahead
2:39
PJM Scheduling Services
Рет қаралды 4 М.
How to Correct Out of Sequence Progress in P6
9:03
PJM Scheduling Services
Рет қаралды 2,3 М.