First comment. Been watching for 2 years now. Started with a small sidewalk project and some interest. Just dumped out 9 yards for a crawl space. Went perfectly. An honorable man you are for showing my generation this for free. Thank you Mike!
@gordybishop23757 ай бұрын
Thicker the better. Thermal mass rocks. Get it hot, keep it hot. Less fluctuating etc.
@sstocker317 ай бұрын
I'm watching because I used to pour concrete 40 yrs ago.....your process is so satisfying to watch, pros in action!
@MikeDayConcrete7 ай бұрын
Thank you
@Unknown-pc9yq7 ай бұрын
The GC saved so much money having his subs do all the work and likely got a hell of a deal since it was his home he can pour it as thick as he wants! Good for him, it will never crack and it will hold in all that heat much longer.
@Aaron713047 ай бұрын
It will crack though.
@medliningmachineworks82907 ай бұрын
If it’s just for a standard building, I think he did a wonderful job going on the heavy duty side. I am myself have a 16 inch thick slab that supports 8 inch thick poured concrete walls with a 8 inch thick concrete ceiling above it I did this years ago and to this day the slab it sits on, and the slab above your head has absolutely no cracks in it it has a tremendous amount of rebar in the 16 inch slab in the walls and then the 8 inch overhead slab. The steel in the overhead slab is a truss configurations, but the trusses are on the inside of the 8 inch slab going both directions width and length wise. A professor of structural engineering looked over my design years ago and says I have a load rating on my 8 inch overhead slab of at least 16,000 static pounds so I could park a tractor from a tractor trailer on it if need be. A yard of concrete is $150 a yard around here so it’s an extra 10 yards to make it extremely heavy duty. Many of the house foundations in my area crack because these poorly drained construction companies put a basement in a single-story house on top of an 8 inch thick footer. It’s only 12 inches wide. When someone’s paying hundreds of thousands of dollars for a home with an extra 1500 bucks to make sure that the foundation is extremely heavy duty. Do you know extremely heavy duty is the reason the Roman Colosseum is still standing after 2000 years after enduring numerous earthquakes going extremely heavy duty is cheap in the long run when you can sit in a lifetime of the building
@MikeDayConcrete7 ай бұрын
Thanks for sharing 👍
@greenwolf4017 ай бұрын
I think that with the greater thickness, once it gets to a constant temperature, will be easier to maintain due to the thermal mass of the concrete. And with the even thickness, the heat will be consistent throughout the slab.
@nathangardner7727 ай бұрын
My dad is getting really old and he forgets everything. Maintenance on his house has gone to the wind. I see my mom needs help with the house and the property. I’ve been building/remodeling for 24 years about an hour away. I’m going to fix up their property, because what kind of son would I be if I didn’t. Concrete will be a major part of it. Retaining walls, driveway in sections, maybe part of the foundation. I bought a mud mixer about a month ago and have been watching concrete videos pretty much every night. Thank you Mike. Your videos help me out. Im learning more everyday.
@MikeDayConcrete7 ай бұрын
That's awesome, thanks for watching
@Yorkie2857 ай бұрын
Your crew work together and as team, each know exactly how to wok behind each other to make the job easier and better.
@Z-Bart7 ай бұрын
8" seems like a bit of overkill but if that's what the home owner wanted, more power to him. Also, with 8" of concrete he should never have a worry about drilling into a radiant heat pipe. Looks like he did a great job prepping for the pour.
@superiorasphalt7 ай бұрын
Mike, why don't you post videos of driveway pours ? Do you not do driveways ? Thank you in advance
@jonathanrighetti58977 ай бұрын
im in jersey and we dont see many rear discharge trucks by me, makes the work tougher
@mikebartley42617 ай бұрын
In my opinion, I believe from what you have said about this mans work, and from what I can see here. It is not too thick, and this from the looks of it, he knows what he's doing, and what he wants.
@tomthompson74007 ай бұрын
he did well , just a man with a good pair of hands getting exactly what he wants and saving cash along the way ,,, his savings there will easily pay for two inches of concrete , and that wont really matter in the overall cost of a house ,,, so hes winning all the way , and you guys in to ensure its perfect ,,, winning again, I like this mans style.
@MikeDayConcrete7 ай бұрын
Good point
@henrykaiser35197 ай бұрын
Mike love your videos I've been watching them for a few years now. I'm about to start my garage in western mass. and was wondering what size footing to make for a block wall foundation also I'm building into a bank it will be about 6 feet higher than the finished floor height how deep would you go into the ground on those two walls ? On the other two walls I know I have to go 48 inches in the ground for frost, what are your thoughts?
@oby-16077 ай бұрын
Those conveyor trucks are awesome. Hate to use the word "should" but the homeowner should have laid the perimeter foam first and since you are in Maine probably four feet down as well to help stop heat transfer and cold invasion.
@BurtmannNautique7 ай бұрын
Nice work all around. Nice prep work as well as the work team all being on the same page. 8” works for me
@MikeDayConcrete7 ай бұрын
Awesome, thank you!
@1320pass7 ай бұрын
Brilliant with the heated slab. Thick for the thermal stability. And an extra 2" will never hurt anybody 😉🤣
@MikeDayConcrete7 ай бұрын
Thanks
@cporter17757 ай бұрын
Looks like he did good. but looks like the radiant tubes n mesh are just setting on the foam. For my radiant floor made 1 inch wood blocks to give a space, but only 4-1/2 thick floor inside footing and short wall foundation. Thanks for sharing
@sr707ca87 ай бұрын
Give the customer what they want I say
@coloradomountainman86597 ай бұрын
You would still need a frost wall if the garage is heated. Here in the Colorado Rockies, we need to have a 48" frost wall on a footing. The slab is either poured over the top of the frost wall or more commonly the wall is a bit higher and the slab is poured up to the wall but using expansion joint material between the two. Looks to me other than the absence of a frost wall, the homeowner did a stellar job.
@electrake20637 ай бұрын
Commenting as requested:-) My gut tells me it isn't a bad idea. It greatly simplifies the preparation to go with one thickness, and having all that thermal mass does a great job at storing heat energy. I've poured several pads inside frost walls (I never like t he idea of a single pad without a frost wall here in Freeport Maine). The pads I've poured are generally 6" thick, I really dislike 4" pads, not only because I like the flexibility to put in a car-lift later on in my garages, but all of the pads I've poured have only ever shown hairline cracks, even with no relief cuts! The last one I poured was for an outside carport in Maine, and in 5 years, the 25'X12'x6" pad (with rebar around columns and wire mesh everywhere - AND fiberglass even - and NO relief cuts) has absolutely zero evidence of any cracks. It gets the full Maine winter, only protected by the rain - broom finish. Came out great. I swear the 6" thick pad made all the difference.
@MikeDayConcrete7 ай бұрын
I feel the thicker pad is better also.
@jjll84507 ай бұрын
Mike, what did you charge him to come in and pour? I am thinking about doing the same thing. Thanks!
@mikeknoll11307 ай бұрын
I used to do slab on grade foundations here in west Michigan they were 2’ in the ground on the perimeter..4” in the center. Now that way has been eliminated by code enforcement. A poured wall is now required 4’ into the ground, then pour the middle after compaction. We can still do some small buildings that way in the right soil conditions.
@will52867 ай бұрын
If the slab bottom and sides are really well insulated-at least 4 inches, but preferably 6"+, of foam that is really tight and well installed-then it makes sense because the concrete acts as a heat sink that will reduce the heating system cycling by radiating for longer periods (and losing less heat to the ground). Back in the 70s & 80s, us back-to-the-landers were experimenting with passive solar heat being absorbed by a bare (or tiled) slab in the living area. Great idea-still valid-but back then we didn't really understand vapor barriers and didn't have access the the present day insulating materials.
@cathiwim7 ай бұрын
I think this homeowner is brilliant!
@MikeDayConcrete7 ай бұрын
Thank you
@Patty-qh3lm7 ай бұрын
I've never seen a monolithic slab without the reinforced perimeter grade beam.
@craiguglandrealty37057 ай бұрын
Wet Set Rebar at Perimeter mentioned in the video.
@patricklucero8157 ай бұрын
To each thier own. I have a roll forming operation in a 50 x 110 shop. The steel coils weigh anywhere from 6k to 12k and the forklift required to move them around is about 25 tons. My slab is only 5" thick. The peninsula i live on is basically a sand bar about a mile wide, no rock in the soil. 4000 psi mix with fibers and mid range water reducer, but no rebar other than on the perimeter edge. saw cuts on a 10'x10' grid. Floor has been down for 11 years and there is only 1 crack where it makes a corner around my office portion which is not even an area that sees heavy traffic. Bigger isnt always better or needed, nothing beats a properly prepared sub-grade. So the main benifit i see with the 8" thick is the thermal mass.
@petem62917 ай бұрын
Mike I think we need more builders that think like he does, that house may stand 100 years , the foundation work can never be fixed once the house is on it …it’s not overkill it’s insurance…
@MikeDayConcrete7 ай бұрын
He is a really good builder 👷♂️
@stewatparkpark29337 ай бұрын
Completely pointless having the reinforcing mesh laying flat on the bottom .
@davidworks77587 ай бұрын
It's about thermal mass, smart. The concrete will absorb the heat and distribute it slowly.
@GrumpyAndCricket7 ай бұрын
I find it interesting that in Maine you are pouring a house slab 8 inches thick and we are doing a shed slab for a 14' x 24' and the town it is in wants a haunch 1 foot wide x 2 foot thick. Cape Cod. Don't understand it they don't even show any re-bar on the perimeter. Hard telling not knowing!
@mitchbeard89207 ай бұрын
How many of those conveyor trucks does Haley’s have bloody awesome idea
@ezdeezytube7 ай бұрын
Where are the footings though? If hes going for thermal mass I would have insulated the footings aned edges prior to the pour, instead of adding it to the edge afterwards
@johnn.eropkin98957 ай бұрын
Where's the footing on the edges, that's where the weight of the house is. Building codes?
@kookiethebear7 ай бұрын
The perimeter footer should be thicker than 8in. One reason, it prevents horizontal slippage.
@kdcustomwoodworking7 ай бұрын
Hell yea the 8 inch , but I think you need more rebar to make sure all is reinforced. Good video watching because I have a slab to do and in are area not to many guys to get a flat slab so I want to learn. The reason I know is seen so many brutal jobs through out the years .
@tylerkurfees47627 ай бұрын
Idk about up there but here in NC, we run fully loaded (88k+ pounds) tractor trailers over unreinforced 6” slabs. So yeah, thats wayyyyy overkill.
@niveknospmoht87437 ай бұрын
Done quite a few garage floors that are 8'' thick. Pretty common here with people wanting to put lifts inside. House slab? Little overkill for a house slab, but not going to hurt anything. Personally don't do house slabs--hate 'em
@danh47667 ай бұрын
Im ok with the slab thickness. More concerned if there was enough form support around base.
@vincentstouter4497 ай бұрын
The thickness of the slab and substrate is based on the design specification. For instance if he is going to park a 40K# diesel pusher class A RV, Tractor trailer or a bunch of cars on the slab then a thicker, reinforced, higher pressure concrete is warranted. Likewise if the soil has high clay content, then a thicker gravel layer and french drains may be needed to prevent heaving from trapped water which freezes.
@fredperry23587 ай бұрын
Unobstructed clearance from re-bar, mesh or thermal tubing to finish floor elevation is normally 2” in my area (Pennsylvania). So, depending on steel and tubing placement, 8” is probably overkill.But if they ever experience power outages for a period of time, frost upheaval could certainly cause slab damage. The cost for remediation would be more than the initial cost of installing extra thickness In the beginning.
@seancasey24447 ай бұрын
Looks like he did a pretty good job on getting it ready. And 6 inches thick is probably enough.
@troyqueen95037 ай бұрын
Days of retained heat with a thicker mass ,especially in winter when your power is off.
@ShonWolf7 ай бұрын
Form stakes seem to far apart did the forms stay straight ?
@bradbaker98567 ай бұрын
The prep work looks awesome 8in is a little over kill but it's his $
@floydwilliams33217 ай бұрын
Well done
@Ifishmo7 ай бұрын
isn't there some IRC about slab edge thickness/reinforcement (rebar)? Slab prep looks great but with no footer/thick edge...nope-don't like it
@D.Fie.7 ай бұрын
............................ Adding subtitles to the Shorts is good... However, adding subtitles to video is not good. It takes away from watching the video.
@ronaldoleksy82647 ай бұрын
Great prep. Thermo mass at a finest moment
@MarkOstrowski-s7n7 ай бұрын
Nice job mike day
@Joe-jv5mm7 ай бұрын
Educational, every Day a School Day 😉
@trygveskogsholm59637 ай бұрын
Your foundation cracks, then your house cracks, then you get pests and drafts and it never stops. No 8" is not overkill. The deep profiles on the edges are worth it though, especially if you put stiff reinforcement down there like the fiberglass rods.
@registrationhater7 ай бұрын
A thicker slab holds more heat than a thinner one. Once you get it warm, it stays warm longer
@jborn7307 ай бұрын
Shit. That's genius. 8" is lovely. Will last forever.
@100Proof-n5d7 ай бұрын
Anything that’s overkill lasts longer. I hope you know this Mike 🎉
@DanTaron-l5o7 ай бұрын
Closed captioning was annoying
@Nihilumbra7 ай бұрын
Текст на видео прекрасная идея👍
@adventuresofneric26247 ай бұрын
I guess my two questions would be. Did the homeowner actually save money or do you charge more when the workload is decreased? Legally are you responsible for any failures that occur with him doing the base work or did you have to liability form that out?
@lachlanitis23117 ай бұрын
If there is already styrofoam there an 8 inch slab isnt necessary 🤔. But at the end of the day its his money and he did a good job prepping.
@johnfahey72157 ай бұрын
yeah, come alongs! that’s what we called ‘em. I dunno, conveyers,water reducers,battery screeds and battery bull floats, I feel like we were cavemen back in the day 😂 We seldom saw even front loaders back then. Love your videos, I’ve even learned a few things! you can teach an old dog! imagine that 😀 The Old Retired Laborer
@jacobbuckley82327 ай бұрын
Didnt see anyone pulling wire
@joepfeiler59117 ай бұрын
If he used 2x10s and put 2 inches of Styrofoam inside them he did not end up with a full 8 inches. A 2x10 actually only measures 9,25 inches less the 2inches for foam is 7.25. . If that's what the customer wanted, I wouldn't have told him he was wrong,.
@respeckmyname747 ай бұрын
small ass slab what is that a 1 bedroom micro house?
@morg527 ай бұрын
You can have ten guys who never worked concrete before, don't know what they're doing. A guy in charge who has no leadership skills, screams at everybody, throws shovels around, and winds up with a boat anchor. Or you can have three guys who are a part of a well oiled machine who each know their place and have the skills, knowledge and perspective, to get the job done perfectly. If all the contractors I had to deal with for the past forty years or so were as good as you, I might not have been in as much of a hurry to retire.
@movaughn207 ай бұрын
The question is... Did the engineer, county, or city sign off on plans for a structure to be built with no footing?
@dougeing65217 ай бұрын
I don’t see how they could have signed off on anything. Regardless of a heated slab that will not stop the cold from freezing the soil and raising the entire building.
@mikee80747 ай бұрын
Please get rid of the banner at the bottom. It's very annoying.. Stan, dirt monkey used to have one until everyone complained.. he removed it...thx Mike?.. we really live the channel..👍🇺🇲
@MikeDayConcrete7 ай бұрын
Ok sorry
@user9900777 ай бұрын
Hmm. It's a good idea to spell kumalongs with a "K", that's for sure...
@Serious-Man7 ай бұрын
KZbin already generates closed captioning. So whatever the jumping green words are all about, it's distracting and unnecessary.
@markusjoseph52567 ай бұрын
Only builder would know .
@chadfernelius90967 ай бұрын
Any creature can dig a couple of inches and get right under the house. Doesnt seem right.
@dirkdiggler20527 ай бұрын
I didn’t understand the word “overkill”. I looked it up, it is commonly used by beta males or people that suffer from low-t.
@garynelson36347 ай бұрын
What does it matter, that's what he wants, its what he's paying for