Рет қаралды 69,983
For skippers: Ride from (Leonrodpl.-Babarastr.) 3:17. From 6:03 the four-segment Avenio. From 9:09 the new (updated) announcements. INFO: Now, finally in passenger service. Siemens delivered 4 four-part, 9 two-part and 9 three-part Avenios, last both should be used only in double traction on the line 20. Unfortunately, this is made more difficult by our Technical Inspectorate (again and again), because the three-part vehicles (T3.7) are not yet approved for test drives. The approval for a possible traction operation of both two-part Avenio is earlier than the approval of the three-piece vehicles. In this delivery batch also four quarter-liter (T4.7) were delivered, which also celebrated on Monday all four their first service on the tram route 19. Compared to the 8 Avenios (T1.6) of the first series (delivered 2014), it was possible to implement further fine adjustments for the MVG. A new front design was necessary to integrate the clutch well.
On line 12 now 5 courses of this two-parts are used because the passenger volume is manageable, than on other lines. As another option, the line would have been switched to bus mode because there is a lack of vehicles.
Of course, I've also included a few scenes in this video of the four-part Avenio T4, the new announcements and the Avenio T1.6. I am very happy about suggestions and your opinion.
I apologize for wind noise and "camera shaker" a lot. The weather conditions were bad.