Piping Engineering : Valve Testing - body, seat, backseat & seat pneumatic

  Рет қаралды 8,218

GOURI SANKAR SAMANTA

GOURI SANKAR SAMANTA

Күн бұрын

Пікірлер: 15
@sen-ow7ub
@sen-ow7ub 2 жыл бұрын
Very nice video you have explained with very basic simple practical explanations I have never seen such a clear video with such explanations. in future we all request you to keep sharing such excellent video.
@jose941978
@jose941978 Жыл бұрын
Truly detailed and precise explanation
@heshammatoug4860
@heshammatoug4860 2 жыл бұрын
Hi Gouri We need you to explain to us how to inspection test plan for valves Thanks 🙏
@CarlosAndresRomeroToscano
@CarlosAndresRomeroToscano Жыл бұрын
Excelente video. Muchas gracias
@aghilmoghbeli7626
@aghilmoghbeli7626 2 жыл бұрын
Very good video
@rajeshmavia5424
@rajeshmavia5424 2 жыл бұрын
Thank you so much sir.. belated teachers day wishes. For bigger size valves, how we lift weight and test will be done in larger test benches ah sir?
@akurathinaveenkumar
@akurathinaveenkumar 4 ай бұрын
Can you please send the drawing of air-hydro test bench... please
@ajay_constantine
@ajay_constantine 5 ай бұрын
Sir during the seat testing shouldn't the valve be in horizontal position? Because even if there is any tiny leak which is in the acceptable range we could identify it easily?
@gourisankarsamanta7670
@gourisankarsamanta7670 5 ай бұрын
Yes
@rajeshmavia5424
@rajeshmavia5424 2 жыл бұрын
Pneumatic pressure 5.5 bar is mandatory sir? Or we can go beyond or reduce this pressure level
@raviv9157
@raviv9157 2 жыл бұрын
Dear Sir, Why gland bolts are loosed incase of hydro testing which is not going to do when valve installed in the line in the industry?
@gourisankarsamanta7670
@gourisankarsamanta7670 2 жыл бұрын
Gland bolts are loosened only during backseat testing to ensure that there is no leakage through the gland so that at site when the valve is under operation, gland packing can be removed or replaced without closing the valve.
@shika-ri
@shika-ri 9 ай бұрын
Sir , as per API 598 during shell test valve shall be partially open but your valve is fully open , can you explain why?
@gourisankarsamanta7670
@gourisankarsamanta7670 9 ай бұрын
During valve body or shell testing, valve can be kept partially open or full open. Requirement is, valve body and bonnet should be pressurize together.
Piping Engineering : Valve hydro testing (body, seat & backseat)
12:42
GOURI SANKAR SAMANTA
Рет қаралды 14 М.
Piping Engineering : Gate valve wedge - solid, flexible & split
9:35
GOURI SANKAR SAMANTA
Рет қаралды 10 М.
Мама у нас строгая
00:20
VAVAN
Рет қаралды 12 МЛН
Муж внезапно вернулся домой @Oscar_elteacher
00:43
История одного вокалиста
Рет қаралды 7 МЛН
УДИВИЛ ВСЕХ СВОИМ УХОДОМ!😳 #shorts
00:49
SIZE DOESN’T MATTER @benjaminjiujitsu
00:46
Natan por Aí
Рет қаралды 7 МЛН
Gate¥ Valve Manufacturing Process. The Most Amazing Production Factory
16:50
Amazing Skills Discover
Рет қаралды 40 М.
Valve QC Inspection & Testing procedure [Pipeline ]
30:33
Welding /NDT Inspection
Рет қаралды 22 М.
How To Do Hydrostatic Testing Or Pressure Test For Valves | Gate Valve
10:22
HOW TO CHECK VALVE INTEGRITY?? VALVE HYDROTEST
7:23
Oil & Gas field Quality control
Рет қаралды 1,9 М.
Pressure Testing | Hydrostatic Test | Pneumatic Test | Piping Mantra
17:15
Globe Valve Maintenance (do it yourself)
11:42
Technical Engineering School
Рет қаралды 44 М.
Control Valve Leakage Class (ANSI FCI 70-2)
12:19
Asad (I&C Engineer)
Рет қаралды 3,7 М.
Мама у нас строгая
00:20
VAVAN
Рет қаралды 12 МЛН