Once Metro construction is over, I hope they lay great roads with proper footpath and water drainage systems. We have endured horrible roads and pollution for too long!
@Abubacker-kv3tu21 күн бұрын
@@vickythaya4451 no pls migrate to overseas. That's the only hope.
@RamKumar-pe7hp4 күн бұрын
I hope they acquire some land to construct footpaths the roads are too narrow at many places
@saikrishnathiwakarrk18 сағат бұрын
@@RamKumar-pe7hp they did that in one place it was too narrow to construct,ao they bought jouse on both side of the road demolished the road and made it big for metro to go. Slowly as other cities develop people will go to their hometown. And chennai will be normal.
@suryabala_00519 күн бұрын
Porur Needs Bus Stand Also Due To More Population And Upcoming Metro...
@68tnj21 күн бұрын
Very nice video update. Thanks for sharing
@City_Breeze-121 күн бұрын
Thanks for watching.🙏😃
@Karalmarks_Pvm21 күн бұрын
Good update congratulations
@City_Breeze-121 күн бұрын
Many many thanks.🙏😃
@karagis7521 күн бұрын
Thanks 🎉
@City_Breeze-121 күн бұрын
You're welcome 😊
@felix3408421 күн бұрын
Good update bro Please post a video on the update of Sholinganallur to Siruseri
@City_Breeze-121 күн бұрын
Sure I will.Thank you.🙏😃
@vro66714 күн бұрын
Please cover the Phase 2 Corridor 5 madavaram- Sirsueri construction update OMR ROAD Section. And Congrats 🎉🎉 for your Hardwork of Video making.
@Fansofcrafting20 күн бұрын
❤❤❤❤
@City_Breeze-120 күн бұрын
Thank you.🙏😃❤
@altruisticframe197921 күн бұрын
The progress is depressing. No way this stretch is going to open in 2026 or even 2027. 2028 if the pace picks up from now. Otherwise that itself is doubtful.
@SureshSundaram-t5f20 күн бұрын
True it will open late
@City_Breeze-120 күн бұрын
Thanks for your comment.🙏
@baskark951321 күн бұрын
Super bro
@City_Breeze-121 күн бұрын
Thank you.🙏😃
@meenasambandan471421 күн бұрын
Superb brother, nice to know the details
@deepakdkrishna185421 күн бұрын
We have huge man-power shortage as on 2024 Diwali. Contractors finding it difficult to bring the labour's back to chennai construction site from their native . They didnt turned up for last 2 months. Now they are hiring new labours. And hindu news article officially said, It is going to b very challenging to complete ponamalle - porur stretch by 2025 dec as per agreed deadline. So this porur to powerhouse will b completed only by 2027 end. Inum station construction foundation kuda start panala. Hw is it possible by 2026 mid.
@City_Breeze-121 күн бұрын
Thank you so much 🙂
@KumarVelu-i3u12 күн бұрын
Verum pillar than iruku for past 5 years . Station apo varum sir ? 🤣🤣🤣
@nagarajm570121 күн бұрын
Phase2 metro slow avg speed 30km than phase1 avg speed 35km, phase 2 romba curves irukku in elevated and underground also 900 steep curves, double decker metro track to balance vibration running metro trains neriya metro station irukku 26km 30 station long distance porathuku suitable illa uyire poidum city limits best luggage vachi eduthu poithu fesabile illa bus is better metro is costly to travel 40rs per trip irukku phase 2 complete panna 70-80rs per trip avum maximum ticket rate
@City_Breeze-120 күн бұрын
Thanks for your comment.🙏
@rahulram879517 күн бұрын
Chennai and its annoying poster culture. every where
@City_Breeze-117 күн бұрын
Yes. you are right. wht to do.😃 Thanks for your comment.🙏