In run 2 there will be total float of 1 at C but you write it in B row correct it sir 👍
@royzaragosa2721Ай бұрын
I thought I'm the only one who noticed that😅
@jasoncysiu3 жыл бұрын
You saved ooour life in 9 minutes -- something that the DOCTOR (or so called PhD) cannot even do! Legendary!
@pratiklohar45665 жыл бұрын
Undoubtedly Best Explanation on Crashing Ever ...!! U made one small mistake while writing TF in run-2.
@Engineer4Free5 жыл бұрын
Hey Pratik thanks for watching and pointing it out! I believe I have mentioned it in the video description, but thanks again!! Do check out part two as well 🙂
@nicholeh12806 жыл бұрын
So very helpful! This and part two. I would not have gotten this right from just reading the text book.
@Engineer4Free6 жыл бұрын
Thanks for letting me know, glad to hear it :)
@SlimJimBigWin8 жыл бұрын
Thanks for the video, there is a typo in the predecessor column since the predecessor of E is also E and there is an F while there is no F as an activity.
@Engineer4Free8 жыл бұрын
Thanks for pointing that out! I added in an annotation at 0:22 correcting the typo.
@kavilenraaj30844 жыл бұрын
Can I know why you didn't choose activity c which is 400 is cheap to crash?
@Engineer4Free4 жыл бұрын
It's because initially Activity C is not on the critical path. You'd have to crash it twice AND also crash activity D for it to have an impact. Cheaper to take E and B first. See part 2 of this example: kzbin.info/www/bejne/ZqClhquopd-Knq8 as D and C eventually do get crashed
@henryanda4255 жыл бұрын
Nice video very helpful....but the predecessor for activity E is C & D not E & F please correct that.
@Engineer4Free5 жыл бұрын
Yeah sorry about that, it's a typo. I made a not of it in the video's description.
@Feri95 жыл бұрын
there is typo at 9:35,total float in table should be 0 for B and 1 for C
@Engineer4Free5 жыл бұрын
Yeah thanks for pointing it out. The typo is acknowledged in the video description, and I saw your comment on the part 2 video too =)
@alaamohamed-vt9xq4 жыл бұрын
in the first crash process when crashing the duration from 18 to 17, should we also remove the cost of one day from E activity so the new total cost would be 16,900 instead of 18,800 and do the same for the other crashes
@Engineer4Free4 жыл бұрын
Hey good question. In general, no. If Activity E has a normal cost of $1,900 for the entire activity, then we should assume that it retains that base cost of $1,900, and only add the $500 (cost per day to crash) for each day that we crash it by. So in this case, we spend an extra $500 to crash it by a day, and the base cost is unaffected. So then Saving the $600 in project overhead, we just reduce the total project cost by $100 overall in this step.
@alaamohamed-vt9xq4 жыл бұрын
@@Engineer4Free what about the last crash for 2 days crash at the same cycle (for D & B), why we did not use 1000 USD for 2 days instead of 500 for one day
@alaamohamed-vt9xq4 жыл бұрын
sorry for D & C
@a_potat Жыл бұрын
quick question. why not have the start as 1? since the first day is one , then start day for the next activity to be end date of first act+1?
@dankd10696 жыл бұрын
instead of overhead cost what if it said company will get x amount of reward per day if completed early? how would we amount that
@Engineer4Free6 жыл бұрын
Pretty much the same approach. Just sum up the cost of all activities, and that will be your total project cost before crashing. Add any costs that you incur by crashing, and subtract the reward for each day that you shorten the project by.
@dankd10696 жыл бұрын
thanks so much
@sojanmathew6764 Жыл бұрын
Hello! I have problem same related to this. How can I contact you for this ? Thanks
@brahimelboudani6017 жыл бұрын
I just want to get this right. You said we should start crashing the activity with the lowest cost on the critical path. B= 400 and E=500. Could you please explain why you crashed E first? I a bit confused there
@christianrazvan7 жыл бұрын
B is 600 , C is 400 but not on the critical path
@brahimelboudani6017 жыл бұрын
thanks
@baijumehta84953 жыл бұрын
Thanks for a wonderful and very clear explanation. Would like to know which tool did you use for drawing the Network Diagram.
@Engineer4Free3 жыл бұрын
Thanks Baiju! I used Sketchbook and a Bamboo Wacom drawing tablet. The full list of my hardware and software that I use to make the videos is here: engineer4free.com/tools
@baijumehta84953 жыл бұрын
@@Engineer4Free Thanks a million. Have watched all your Project Management Videos.. All of them are awesome.
@joeytadayo6941 Жыл бұрын
I thought you first calculate the slope to determine which is the lowest amount to crash
@mohammedabdalhadi17982 жыл бұрын
In Run 2 the project cost cannot be reduced as long as the duration is reduced
@nada2excoo6 жыл бұрын
Thanks a lot for your videos. Can you tell me how you calculate crash duration?
@Engineer4Free6 жыл бұрын
Thanks for the comment! Crash duration is typically just given to you in these types of problems, and has to do with the physical limitations of how fast the activity can be performed. Imagine that the project is a house build, and one activity is painting. The painters might tell you that they will take 6 days to paint, but if you pay a higher rate, they will bring out a larger crew and it will take them only 4 days. They know that their full crew can still only paint so fast, and the amount of painting required will take their full crew 4 days. Mmmmm that's just the first example that came to mind, does that make sense?
@peterlisena35094 жыл бұрын
How would you find the minimum expected time that a project can be completed?
@Engineer4Free4 жыл бұрын
Before crashing? Just do the forward pass to find the project duration. If we're talking about minimum crashed duration, then follow the steps in this video and watch part 2, as well as the explanatory video. Links should be in the description.
@asi19682 жыл бұрын
C has a total float of 1 Or I’m getting this wrong ?
@clemencejacob41592 жыл бұрын
quite helpful. It requires practice oftenly
@sailiumale769727 күн бұрын
What if direct cost is not given then how to slove?
@kostasgeorgop7 жыл бұрын
hello! thanks for the videos. on run 2 Tf=1 should be on activity C or am I wrong?
@Engineer4Free7 жыл бұрын
Thanks for pointing that out. There is an annotation catching that error but it will not display if you are viewing on a mobile device, and also might not show up on desktop if you have adblock. I updated the video's description with the correction.
@kostasgeorgop7 жыл бұрын
Engineer4Free yes I also saw the next video that you also point out the fault! :)
@mazrimamat98994 жыл бұрын
Useful information about project crashing.Thank you
@Engineer4Free4 жыл бұрын
Great! More over at engineer4free.com/project-management too 😁
@divinelymoi4 жыл бұрын
How do you calculate the crash duration?
@Engineer4Free4 жыл бұрын
Hey, try video number 27 here: engineer4free.com/project-management or here is the direct link: www.engineer4free.com/4/project-crashing-explained
@shibadaddy86392 жыл бұрын
you are the professorrrr
@knifewars51314 жыл бұрын
Very useful. I didn't know wich activity of the critical path crash first.
@mushayatikamal78904 жыл бұрын
Thank you for this link Dr.
@Engineer4Free4 жыл бұрын
You're welcome. The whole PM playlist is here: engineer4free.com/project-management =)
@ahmadammar95164 жыл бұрын
Nicely explained....but seems a typo here: how come table on the top shows 'E,F' as predecessors to 'E' ?? I believe these are 'C,D'
@Engineer4Free4 жыл бұрын
Hey Ahmad, good eye. Yes that’s a typo, there’s a note in the video description that acknowledges it. Thanks for pointing it out, and I sorry for any confusion that it caused!
@ahmadammar95164 жыл бұрын
@@Engineer4Free my bad!..i missed the note. Thanks
@Engineer4Free4 жыл бұрын
🙃
@anitap.44725 жыл бұрын
How would you calculate the Net Profit?
@stellathai49994 жыл бұрын
how can you figure the total float?
@Engineer4Free4 жыл бұрын
Hey Stella, see videos 13, 14, 15 here: engineer4free.com/project management for total float
@Hgb99992 жыл бұрын
can i knw book where u got question?
@Engineer4Free2 жыл бұрын
I made it up myself 😊
@عبدالرحمنالسديس-ن4ب7 жыл бұрын
I think you made a mistake in TF of the second round, am I right?
@Engineer4Free7 жыл бұрын
There is an annotation that shows up at 8:39. If you are watching on a mobile device or using adblock, you won't see it. It says "Sorry, I accidentally wrote TF=1 for B, I meant to write TF=1 for C... I catch this error in part two of the video." - So yes, for B, TF should be 0 and for C, TF should be 1.
@allysamariejipus42475 жыл бұрын
Hi. Isn’t the project cost on run 1 supposed to to be 18,400? ..
@Engineer4Free5 жыл бұрын
Hey, it should be 100 less than the initial condition. Because we pay 500 extra to crash, but save 600 on the overhead of one day. So it will be 18,800 after run 1.
@allysamariejipus42475 жыл бұрын
Oh.. thank you
@cartoonchannel14806 жыл бұрын
How you are calculating the additional cost
@Engineer4Free6 жыл бұрын
In this example it is just given in the original table in the far right column. That would be pretty common in an exam situation to be given the cost and just have to deal with it, not calculate it with no other information.
@cartoonchannel14806 жыл бұрын
Thanks
@TheAbdallahalmassri4 жыл бұрын
Amazing succinct explanation. thank you
@Engineer4Free4 жыл бұрын
Glad it was helpful! Thanks for watching =) the full playlist is here: engineer4free.com/project-management
@sunilchanda12126 жыл бұрын
can you tell me what actually is overhead cost is it labor charge and activity cost means material cost??
@Engineer4Free6 жыл бұрын
Overhead cost in this example would be additional costs to the project that aren't associated with any particular activity. For example, a flat rate for a project management fee or 24/7 site security if it was a construction project etc. Also, considering material and labour costs separately for the activities is beyond the scope of this example.
@sunilchanda12126 жыл бұрын
thanks for quick reply
@sibusisombhele38806 жыл бұрын
Thank so much you are such a blessing, God bless you