Рет қаралды 89
Part 2
That is the first half floor pan from expressed steel panels is in !
All the patch repairs, seat braces, prep the holes to plug weld, coating, you know, all the usual stuff.
Only thing left to do is plug weld the seat and floor brace in from the inside.
Only one side left to do.
Part 2 will be along shortly