Rental installation for a chocolate warehouse in Austria

  Рет қаралды 458

TRANE EMEA

TRANE EMEA

Күн бұрын

An international chocolate manufacturer needed efficient and reliable temporary cooling for a non-temperature controlled warehouse in Vienna, Austria.
Trane Rental Services provided a full turnkey rental solution from design to commissioning:
• 2 x 500kW air-cooled chillers
• 8 x 150kW air handling units
• 2 x 1,000L buffer tank
• 4 x 200kVA generators
• 600m piping
You are looking for a single source HVAC Rental partner? Contact your local Rental team 24/7 for all your cooling or heating needs on www.trane.eu
Click here to visit Trane Rental Services solutions:trane.eu/rental

Пікірлер
My DIY Geothermal System Was So CHEAP!!!
19:35
Challenged
Рет қаралды 2,8 МЛН
Customer Fired Other Company! Can I Figure This No Cooling Out?
18:25
Jeff’s HVAC Adventures
Рет қаралды 425 М.
Minecraft Creeper Family is back! #minecraft #funny #memes
00:26
Or is Harriet Quinn good? #cosplay#joker #Harriet Quinn
00:20
佐助与鸣人
Рет қаралды 53 МЛН
小丑妹妹插队被妈妈教训!#小丑#路飞#家庭#搞笑
00:12
家庭搞笑日记
Рет қаралды 35 МЛН
Portable Air Conditioners - Why you shouldn't like them
16:39
Technology Connections
Рет қаралды 8 МЛН
Tripping Low Pressure York Air Cooled Chiller Down
26:01
HVACTIME
Рет қаралды 76 М.
5 Years with Solar Panels - Is It Still Worth It?
16:06
Undecided with Matt Ferrell
Рет қаралды 2,4 МЛН
Installing RunTru By TRANE Split System | Would I RECOMMEND Them??
16:51
Minecraft Creeper Family is back! #minecraft #funny #memes
00:26