Indeed, this is very interesting and well done to all concerned with the installation and maintenance of all the level crossings on the RH&DR.
@ryandavis75933 жыл бұрын
Wonderful video. I would love to see more like it. As a locomotive electrician and mechanic I love to see the shops and all the folks like me working to keep the railroad operating. Greetings from the high plains of Texas.
@sazwell4 жыл бұрын
Very interesting stuff!
@anythingrc4 жыл бұрын
Brilliantly done
@TYNTYN994 жыл бұрын
I found that very fascinating. Did someone on the railway work out the PLC program for the crossing or was that done by someone outside of the railway? I’ve done PLC programming before and find it very interesting.