I'd love to see a documentary of this project with close ups of the engineering, overdramatic music with suspenseful shots of difficult logistics, cost overruns and interviews with the team. Like the Crossrail documentary.
@g00rb4u2 жыл бұрын
Interesting that the equipment is hired from Kennards Hire - I might go in and rent the track handling machine to lay my home track network next week
@ccpljager4242 жыл бұрын
so excited to see it completed
@tambu14112 жыл бұрын
I’d love the rail lines operaters begins
@gregmichael84732 жыл бұрын
Hopefully just a typo but at 3:51 the graphic says the gauge is 5 ft. This will be a problem as the rest of the suburban system uses a track gauge of 5ft 3 inches!
@in.2oblivion5802 жыл бұрын
i noticed the same typo , surely
@CPTE50692 жыл бұрын
Maybe it's just that they were too lazy to do 2 sig figs of precision.
@jdillon8360 Жыл бұрын
Yeah I reckon it's just a rough number for the graphics.
@AElias4092 жыл бұрын
Big fan!
@GalacticGuru42 Жыл бұрын
what is the space in the centre of the precast ballast/sleepers designed for -- safety area for anyone who falls between the tracks ?
@MightyCats2011 Жыл бұрын
Cool excited to be able to catch a train to Melb Uni or Domain interchange which currently doesnt have a train station. Hope they will allow 5G reception in the tunnels. I know city loop didnt have mobile reception for many years. Now theres mobile reception.
@GalacticGuru42 Жыл бұрын
large parts of Melbourne's suburbs don't have usable 5G reception, I wouldn't hold my breath for the tunnels to have that.
@andrewrussack86472 жыл бұрын
The track gauge is 5’3” NOT 5’!
@GabeTrains2 жыл бұрын
what date will traralgon staion open
@jaslueasi Жыл бұрын
lol it's already been open all this time, you haven't realised
@MrAljosav Жыл бұрын
@@jaslueasi I think @Gabetrains is referring to the Bairnsdale line shutdown in January due to the Dandenong lines being shutdown around Caulfield for the rationalisation of the Caulfield Junction. Additionally, Bairnsdale line occasionally shuts down from time to time as part of the regional rail revival program.
@sammyjames3466 Жыл бұрын
@@MrAljosav UMMM ACUTRALLY theres no "dandenong" lines the lines that run through dandenong is the cranbourne and pakenham lines
@jeremym48622 жыл бұрын
Very important we say eastern portal, and not South Yarra, as that would just remind us that the plan was compromised from the start!
@melissavredline12642 жыл бұрын
The South Yarra portal states that it is counting out at South Yarra, not the South Yarra station. I agree that there should have been a link to a station there, but that would have added another $1bn to the project.
@tspoon7722 жыл бұрын
@@melissavredline1264 like that 1b dollars that was thrown in the bin by cancelling East-West Link?
@jdillon8360 Жыл бұрын
Every major infrastructure project requires a compromise of some kind. Considering you can easily change at caulfield or in the CBD, the lack of a connection to the existing south yarra station is a minor inconvenience, not a deal-breaker.
@jashithg Жыл бұрын
Why is the absence of the click clack sound a con?
@GalacticGuru42 Жыл бұрын
there are still welds every 165m or so.
@jdillon8360 Жыл бұрын
a throwback to the good old days of rail travel. click clack, steam whistles, etc
@Samsgarden Жыл бұрын
Imagine texing the only people who use this infrastructure.
@margarethennessey5182 Жыл бұрын
This project is not the size of Sydney’s metro they are building. It will take until 2056 to complete it. It started with the one near us and now it’s continuing on to Bankstown. There is also one going to to Sydney’s second airport. You can see the map under Sydney Metro.