Рет қаралды 7,442
I made this video to show the importance of doing thorough maintenance, whether the system is new or old. I ran across this Trane XV variable speed system that was set up to fail from the start. It ran with 700 CFM of airflow on a 4 ton system for about a year due to improper setup in commissioning. The installers forgot to connect the BK terminal and cut the BK jumper for Variable and Airflow signal to the board.