just started a new job as a Project Manager at a construction company after several years at a consulting firm and this video was super helpful as I had a project handed over to me that is a complete mess and I had to learn to update the schedule. Kudos!
@TomStephensontraining4 жыл бұрын
Glad it helped, click subscribe and there are more under th MSPROJECT playlist with more to come
@azko1234 жыл бұрын
@@TomStephensontraining I spent all night watching your other videos. Good stuff!
@danmunyaneza1761 Жыл бұрын
Hi Tom i have been using your tutorials learning MS projects and now I have confidently started using this software in my daily job may God bless you a lot, love from Rwanda❤❤❤
@artiashokpednekar98702 жыл бұрын
I am watching the entire playlist on MSP and I want to thank you for making it so easy to follow with all the tips included! Also thank you for linking the information with Primavera. Great tutorial!
@TomStephensontraining2 жыл бұрын
Thanks Arti, I’m happy they are helping you!
@massari4u2 жыл бұрын
Hi Tom, I am glad I was able to find your vide on Yourtube. I was one of your students in Construction Management from 2012-2016.
@TomStephensontraining2 жыл бұрын
Great ti hear from you Massari , what are you up to in your career?
@massari4u2 жыл бұрын
@@TomStephensontraining Thank you Tom! Worked for EllisDon for a while and now work for another GC building high-rise condos in Burlington.
@sanjayg13403 жыл бұрын
Thank you Tom for such good crisp tutorials. Your method of explaining the topic is good and easy to follow.
@TomStephensontraining3 жыл бұрын
As always thanks Sanjay for the kind words
@masoodhussain1967 Жыл бұрын
4:29 minutes into the video and i am hooked already. Thanks for making such a comprehensive videos for us new to PM
@TomStephensontraining Жыл бұрын
Thanks Masood, I’m glad the videos help you.
@TajK2Maple3 жыл бұрын
Tom’s tutorial is the best MS Project I came across in my 40 years Project Management carrier.
@TomStephensontraining3 жыл бұрын
Hi Wajid, thank you, I appreciate your kind words and the wisdom you must have with that much experience yet you continue to learn on KZbin. That is an example for everyone to learn from. All the best!
@phillipmhindu7219 Жыл бұрын
You are the best Tom. Most proffesors complicate things but u make it look like cutting magerine with a hot nife. May God bless u ajd your family
@TomStephensontraining Жыл бұрын
Thanks Phillip, I really appreciate you taking the time for the kind words.
@randeeptalukdar22503 жыл бұрын
Hello dear Tom, I gotta say that you probably have got the easiest way to make things understandable with a crystal clear explanation of each and every small topic within a bigger topic. Good job on that!
@TomStephensontraining3 жыл бұрын
Thank you Randeep, that is what I attempt to do whenever possible. I find it takes a while to find an easy and memorable way of describing things but when I find it, it is very satisfying when people like you give confirmation feedback. Thanks again!
@randeeptalukdar22503 жыл бұрын
@@TomStephensontraining Hi Tom, it is great to hear from you. Yes that’s true...it’s important to find a crystal clear explanation for a topic out of so many videos for a single topic in KZbin and when we find videos like how your are making.. makes our understanding a bit more interesting and easier!
@agilizity87364 жыл бұрын
this video is outstanding. Thank you so much for your generosity in sharing your knowledge.
@TomStephensontraining4 жыл бұрын
Happy to help
@teepot45392 жыл бұрын
Those views = $$
@Huzayfa96 ай бұрын
Thank Mr. Stephenson for such an in-depth, precise and concise toturial, I have learned a lot here, greatly appreciated !
@TomStephensontraining6 ай бұрын
Glad it was helpful! As always I’m happy to help.
@atanuroyghatak5823 жыл бұрын
Yours is by far the best tutorial on the subject that I have come across. Many thanks
@TomStephensontraining3 жыл бұрын
Glad it was helpful! Many more on my channel under the MS Project playlists
@07XTX4 жыл бұрын
Another great tutorial - I wish I had come across this channel a while ago. Please keep them coming! :-)
@TomStephensontraining3 жыл бұрын
Thanks, will do!
@asifalitcps Жыл бұрын
I wish the same
@ranelsorreda80322 жыл бұрын
Your videos of MSP are all well explained and on point. Thanks for sharing.
@TomStephensontraining2 жыл бұрын
Thanks Ranel, very Appreciated!
@barivureponi10162 жыл бұрын
Thanks for this tutorial. It is easy to understand yet thorough and well-presented
@TomStephensontraining2 жыл бұрын
Thanks so much Barivure
@charmainemdledle94178 ай бұрын
Good tutorial, very helpful indeed. It’s my first time using MSP and I must say I’m more comfortable now to use it going forward, thank you so much.
@TomStephensontraining8 ай бұрын
Wonderful Charmaine!
@rishikantmittal68072 жыл бұрын
Very good , Simplified
@TomStephensontraining2 жыл бұрын
Glad you liked it!
@amitsinghtomar19802 жыл бұрын
Such a fantastic tutorial. Tom really explains it well with logic. Very easy to understand. Its like attending a live class in a University with a great Professor. Thanks a lot Tom.
@TomStephensontraining2 жыл бұрын
Thanks Amit, it is always nice to hear that my videos are helping people like yourself. Very appreciated! All the best.
@rezaheidari21833 жыл бұрын
I really find it very well detailed and well manoeuvred, well lectured and powerful as well as friendly and engaging.
@TomStephensontraining3 жыл бұрын
Very appreciated Reza, im glad it helped and was engaging. Your kind comments provide me with motivation for more
@erikkj14 жыл бұрын
This was a great tutorial, helped me out a lot. Thanks for your time creating it
@TomStephensontraining4 жыл бұрын
Glad it helped! Check out Ms Project Tutorial 6 which is the follow up on recovery. It is listed under the MS Project Tutorials Playlist on my KZbin channel.
@nkyibe12993 жыл бұрын
As always, I enjoyed this tutorial as well....Thank you very much!
@TomStephensontraining3 жыл бұрын
Thanks Nky. Very appreciated
@maeiadali351 Жыл бұрын
Dear Mr. Tom, I find your content very interesting and useful. I appreciate how you teach us with your experience. There's just one thing missing - the files for each lesson. I would greatly appreciate it if you could upload them so that we can gain more benefits. Thank you.
@TomStephensontraining Жыл бұрын
Hi thanks, check my playlists, click on my face below the video then select playlists, there is a playlist called ms project the course, those videos are updated and includ a link in the written description of each video. All the best
@thirikyaw71932 жыл бұрын
Thank you very much sir for very useful tutorial.
@TomStephensontraining2 жыл бұрын
You are more than welcome Thiri
@abdelhakadnane73313 жыл бұрын
Thanks you for your tutorials, and the way you explain the things for us.
@TomStephensontraining3 жыл бұрын
You are welcome Abdelhak, all the best on your learning journey
@darrengodden2 жыл бұрын
Thank you. Very helpful and clear.💯👌👏
@TomStephensontraining2 жыл бұрын
Great Darren, keep on learning!
@surajghimire76194 жыл бұрын
Really good video, Thanks for sharing knowledge
@TomStephensontraining4 жыл бұрын
Thanks Suraj
@1083mohan19 күн бұрын
really awesome tutorial sir, thanks alot
@TomStephensontraining16 күн бұрын
As always thanks Mohan. I appreciate the kind words.
@marlenarhinehart90623 жыл бұрын
Thank you so much for creating this tutorial!
@TomStephensontraining3 жыл бұрын
Thanks for watching, plenty more on my channels playlist. Much appreciated
@rehmaniacademy31993 жыл бұрын
i found out what i was looking, thanks for making understanding that simple
@TomStephensontraining3 жыл бұрын
Great!
@shariqconsultancy57472 жыл бұрын
Precious tutorial. Thanks for keeping it to the point. MPP is like a cockpit control center .. several buttons and controls; all are useful, but need to know which one to press when :)
@TomStephensontraining2 жыл бұрын
Thanks Shariq, good anology. Glad the videos help you!
@Fsp012 жыл бұрын
Amazing tutorial! thank you Tom.
@TomStephensontraining2 жыл бұрын
Thanks Sebastian, very appreciated
@harishbabu6108 Жыл бұрын
Excellent Explanation..keep it up.
@TomStephensontraining Жыл бұрын
Thanks Harish, check out the playlist ms project the course you can download the practice files for each video from drive
@lenava68 Жыл бұрын
Excellent for sharing .
@TomStephensontraining Жыл бұрын
Thanks Leonel!
@amitdobhal2343 жыл бұрын
Very informative video Tom , and you explained it so well.
@TomStephensontraining3 жыл бұрын
Thanks Amit very appreciated
@rajeshraju26743 жыл бұрын
Amazing explanation - This Great Job , Its been very helpful,
@TomStephensontraining3 жыл бұрын
Thanks Rajesh
@Ok-kz3ib3 жыл бұрын
Excellent tutorial…and example is really relatable…cleared my doubts on baselining and schedule updates
@omarharmon46503 жыл бұрын
This video is great very helpful!
@TomStephensontraining3 жыл бұрын
I’m glad it helped you Omar, thanks for the kind words
@camilladaizy78755 ай бұрын
SUCH A GREAT TECHER
@TomStephensontraining5 ай бұрын
Thanks again Camilla, also you may prefer some of my new playlists on MSproject if you click on my face icon and click playlist there is one call MSproject the course where I provide links to Download files you can follow along with.
@birddayparties8 ай бұрын
Learned alot thanks Tom!💯💯👍👍
@TomStephensontraining8 ай бұрын
Thanks for watching, I’m glad the videos help you
@cynthiaanoka56692 жыл бұрын
Great explaination!!!
@TomStephensontraining2 жыл бұрын
Thanks so much Cynthia!
@JohnChristopherBaquing Жыл бұрын
Thanks for this tutorial.very helpful
@TomStephensontraining Жыл бұрын
Excellent! Check my playlists for ms project the course. I have it setup that you can download files from google drive to follow along.
@nashielion40193 жыл бұрын
Thanks a lot Sir...really help me
@TomStephensontraining3 жыл бұрын
Most welcome
@johnmeredith34853 жыл бұрын
Well presented, sir.
@TomStephensontraining3 жыл бұрын
Thanks John, very appreciated
@anishsule32833 жыл бұрын
thanks and appreciated for your valuable time for uploading this video.1T likes 👌👍
@TomStephensontraining3 жыл бұрын
Thanks Anish, I’m glad they help you
@r.i.42593 жыл бұрын
Really good way much better than on my uni course , thanks Tom
@TomStephensontraining3 жыл бұрын
Great I’m glad it helps, lots more on my channel Msproject playlists
@moonlights1184 жыл бұрын
This video really helpfull! thanks for ur clear explanation.
@TomStephensontraining4 жыл бұрын
Thank You!
@civilsl29372 жыл бұрын
Thank you Mr Tom.
@TomStephensontraining2 жыл бұрын
You are very welcome
@amalibrahim6882 Жыл бұрын
Amazing!
@TomStephensontraining Жыл бұрын
Thanks so much Amal
@Alex-hp1nh4 жыл бұрын
It was really helpful.
@TomStephensontraining3 жыл бұрын
Thanks so much
@Alex-hp1nh2 жыл бұрын
Hi Tom, Do you have any fragnet tutorial video?
@irviantantohadiprasetyo6894 жыл бұрын
Good video and really helpful. Thanks
@TomStephensontraining3 жыл бұрын
Glad it was helpful!
@ziaHashimov Жыл бұрын
Such a great tutorial! Is there any chance that we can get this lecture file where we are able to work simultaneously. Much appreciated.
@TomStephensontraining Жыл бұрын
Hi sorry I missed this. Check my playlists for ms project the course and i have start point files that you can download from google drive listed in the description
@ig70613 жыл бұрын
Thank you everythin g is clear now!!
@TomStephensontraining3 жыл бұрын
Great glad it helped
@alejguz15522 жыл бұрын
Thank you sir!
@TomStephensontraining2 жыл бұрын
You are welcome!
@amodehdashti92262 жыл бұрын
Hi Mr Stephenson, Could you please check and explain what happens here: While updating a task around minute 13:40, bringing the starting date of a task 1 day ahead (changing it from 10/10/19 to 09/10/19) and then increasing the duration of the same task by one day, the moment the duration is increased and entered the start date changes and jumps ahead to the original date of 10/10/19 (at minute 13:47); so it does not reflect what you needed it to reflect. Can you please advise the reason? Is it the software bug? or is it something that you needed to do to make sure the change happens the way you wanted it... I'm having this issue a lot, changing a date and changing the duration and one would override the other... Appreciate your advice. Kind regards
@kelseymjudd Жыл бұрын
I have the same question - appreciate any clarification you can provide @Tom!
@kelseymjudd Жыл бұрын
Ah sorry, I see you've answered this in another thread and point to newer videos. Will look there.
@TheTopfu Жыл бұрын
Good video I wonder if you have a video for comercial metal and drywall blue print
@TomStephensontraining Жыл бұрын
Not yet but it is a good idea
@sayedelyaskawish34994 жыл бұрын
Great tutorial. The remaining activities are showing planned dates to the left of the status date, which is not good. It is recommended to use "Update Project" function and "Reschedule non-started tasks".
@TomStephensontraining4 жыл бұрын
Thanks for the feedback
@kunlefads4613 жыл бұрын
Can you explain further please?
@JuricaLoncar9 ай бұрын
Hi Tom. I have a question regrading the update process. 1) Scenario: if the activity didn't started on time and it is behind the status date. Should we first try to adjust the relationship between activities for instance inserting a lag which will move activity first avalaible day after the status date or we should use this "move" option? That confuses me a bit because the "move" option automatically puts a constraint which impact on the critical path. 2.scenario we have activities that started earlier than expected. The predecessor is in progress, but the following one had a FS relationship. Is it better to use a SS+lag or should we implement a negative lag? Thank you in advance for sharing your knowledge.
@rayokorie1356 Жыл бұрын
Hello Tom, this is is quite insightful and you have simplified this more than anyone I know. A quick clarification: In the course of my project, will it be standard to populate the tracking screen with the actual start and finish dates for progressively for the various tasks, prior to a specified 'status date' for general schedule update.
@TomStephensontraining Жыл бұрын
Thanks for the kind words Ray. And the answer to your question is yes, and if something did not start move it to a new planned date to the right if the status date so you can also see the impact that it has on the critical path.
@dowaahamad4038 Жыл бұрын
Thanks a lot, Mr. Tom .. after setting the baseline when am trying to make a mark on track it didn't work..what could be the problem?
@TomStephensontraining Жыл бұрын
You need to set a status date and highlight all activities and then mark on track. It will only update the activities to the left of the status date. Thanks for watching
@DjFeekx_sa Жыл бұрын
Hello Mr Stephenson I would like to ask how do you check variance in terms of percentages
@TomStephensontraining Жыл бұрын
Hi Afi, As far as I know there is not a calculated column for that. Let me know if you find one
@27Madable3 жыл бұрын
@13:30 You tried inputting an early actual start date. When you set the duration as 10 days, MS project got rid of the actual start. After you input 100%, MS Project automatically inputted dates that were different than what you wanted. This is a problem i am facing when ever I try to input an early start date to my tasks. Could you please clarify what is the best way to do it?
@TomStephensontraining3 жыл бұрын
Good catch Ahmad, I suspect if I had changed the duration first or just did actual start and actual finish it would not have done that, but i need to check myself. I plan to start doing videos that answer specific questions like yours so I will include this. Also just to let you know don’t be surprised if sometimes Project acts a little buggy, usually it is not the program but sometimes it is, in those cases there is usually a work around. The more you understand how the program works the easier the work around is. I’m always learning something new myself with this. That’s why I like questions like yours. Have a great day.
@TomStephensontraining3 жыл бұрын
Hi Ahmad, Check my most recent KZbin posting on MS project update problems. I think it will help in a few ways.
@sherifelroba58652 жыл бұрын
Please, Do you have a video about weekly and monthly reports?
@TomStephensontraining2 жыл бұрын
I have on cash flow but you are right i will put one together
@johnsonchelladurai68292 жыл бұрын
Hello sir, Very good morning. You are doing great job . I am just now started as a Planning Engineer. I have a question, how can I find my planned percentage? We are updating the project activities what are the activities are completed and ongoing activities. How can find how much percentage I should completed in the particular date. Please explain
@TomStephensontraining2 жыл бұрын
Hi Johnson the tracking table should help you. Also using mark on track. Check my playlists for updating videos usually videos 6 and 7 have material on that
@tahahussein29884 жыл бұрын
This is a nice lecture . How can get the rest of videos ? Could you please attach the link? Thank U.
@TomStephensontraining4 жыл бұрын
Hi Taha, Click on subscribe and if you go to the MS Project Playlist (I have many other videos on Construction Mgmt, so you may just want the MS Project videos) you will see all the other videos for MS Project. I plan to be putting more videos up this semester as I'm teaching a cost control course and using MS Project. Here are the links in case you still have problems finding them, but as I said once you subscribe it is easy for you to find these and new lectures. • Tutorial 1 Introduction: kzbin.info/www/bejne/aJ3bgKGlna2Grck • Tutorial 2 Calendars & Columns kzbin.info/www/bejne/qqamo4eBgrWolbs • Tutorial 3 How to Maneuver kzbin.info/www/bejne/g2G9Z6Bqorx0prc • Tutorial 4 Resources and Costs kzbin.info/www/bejne/fJumc3ateZp-sNk • Tutorial 5 Updating a Schedule kzbin.info/www/bejne/j6W3ipmOdpaVa5o • Tutorial 6 Recovering a Schedule kzbin.info/www/bejne/e3-3iId_eb6enLM • Tutorial 7 Adding a Change kzbin.info/www/bejne/gnrVgZWkmbWchrc • Tutorial 8 File Saving Protocol kzbin.info/www/bejne/jnu2d2iKaaqincU All the best! Tom
@Brunogtx3 жыл бұрын
Can't thank you enogh! Really really helpful!
@TomStephensontraining3 жыл бұрын
Great Bruno, fyi i have a playlist on my channel with lots of details Microsoft Project videos if you need more help
@ahmadshahrir20025 ай бұрын
Tqsm sir
@TomStephensontraining5 ай бұрын
Thanks for watching Ahmad!
@markkrohn83894 жыл бұрын
Tom, great video. Quick question after you complete your first update. When beginning second update, would I use the most recent updated file? I believe that is what I would need to do, but I am guessing that I would not reset the baseline, only update the status date and update the necessary line items. Is this correct?
@TomStephensontraining4 жыл бұрын
Yes quite right unless you were behind in the update and did a recovery file. In that case you use the recovery file to do the next update. IF you subscribed to my KZbin channel check out the msproject playlist and it should make sense under the file naming protocol video number 8 as i recall
@muhammadyousoufleghari39264 ай бұрын
after setting baseline and Actual Start and Tentative finish. But a activity finish before tentative finish date how we show
@TomStephensontraining4 ай бұрын
Have you checked the variance screen and put the Gantt chart in tracking view? It should show the variance in work days
@kunlefads4613 жыл бұрын
Hi Tom, When do we use % complete and % physical complete in updating our schedule? Do we use one of them or both of them based on the situation in the project.
@TomStephensontraining3 жыл бұрын
Generally percent physical complete comes in if you are using earned value analysis. It looks at the physical side eg if you have 500 blocks laid out of a 1000 is 50 physical complete the other is time or duation
@kunlefads4613 жыл бұрын
Many thanks Tom. Your videos are very insightful! Can we input ÷ complete for planned and physical ÷complete for actual. Meaning can a task be complete 50÷ (%complete) with respect to the duration but physically it is 30÷ completed (physical %complete)? If yes which of the % will be used to calculate the actual cost spent? Also If this is right to be inputted in tracking chart with variance screen, then can we also adjust the dates to suit the actual while considering the overall critical path? The other question is how do we input milestone payments to align with the resource sheet cost calculation for subs. Example: say we pay in 3 milestone payments to a particular sub (deposit 20÷, midway 50÷, then after work 30%). How does this fit into the resource sheet cost per use (end) that calculates cost automatically?
@GeromeVanWyk Жыл бұрын
What do you do in a case where you did not set a baseline and the project has already ran for 3 months?
@TomStephensontraining Жыл бұрын
Hi Gerome, If you have the original file baseline it and update to current date. If not baseline from today and update and recover using file naming protocols. Check out my playlists and look for Ms Project the course you can download practice files and use as you follow along. You can start at the updating video.
@TomStephensontraining Жыл бұрын
Hi Gerome, If you have the original file baseline it and update to current date. If not baseline from today and update and recover using file naming protocols. Check out my playlists and look for Ms Project the course you can download practice files and use as you follow along. You can start at the updating video.
@TomStephensontraining Жыл бұрын
Hi Gerome, If you have the original file baseline it and update to current date. If not baseline from today and update and recover using file naming protocols. Check out my playlists and look for Ms Project the course you can download practice files and use as you follow along. You can start at the updating video.
@GeromeVanWyk Жыл бұрын
@@TomStephensontraining could you provide a link for the above mentioned, that is the playlilst, files and updating video
@rakeshranjan75253 жыл бұрын
Nice
@TomStephensontraining2 жыл бұрын
Thanks Rakesh!
@rakeshranjan75252 жыл бұрын
@@TomStephensontraining Welcome🎉 Sir
@proto833 жыл бұрын
I wanted to ask,how can i show on the gantt chart the late start and finish of each task without changing the critical path?
@TomStephensontraining3 жыл бұрын
You can show it on the schedule table also under format Tab just below the critical path checkbox you can select to show a dark line that is the late start finish.
@frankgarro3890Ай бұрын
Is the sample file available to help me follow along?
@TomStephensontrainingАй бұрын
Hi Frank, check my playlists and look for Ms Project the course. There Are downloads in this series. In the description for each video there is a link to download the file to follow along with.
@phuongbui3331 Жыл бұрын
Thank you Tom, Y can up file MPP for me
@TomStephensontraining Жыл бұрын
Sorry I don’t have for this one but if you go to my playlist and check for MS Project the course a download link is listed in the video descriptions so you can follow along
@etoe94057 ай бұрын
Sir Primavera P6 Tutorials with same tutoring quality are requested please.
@TomStephensontraining7 ай бұрын
Perhaps when I get time.
@TomStephensontraining7 ай бұрын
Thanks for watching
@emakost4 жыл бұрын
Hi tom. Awesome videos. Can you share the files used?
@TomStephensontraining4 жыл бұрын
Not yet but soon as I figure that part out on my webpage
@henrysunkle88714 жыл бұрын
awesome
@TomStephensontraining4 жыл бұрын
Thanks
@Popart-xh2fd3 жыл бұрын
Doesn't Precedences deny setting actual start dates previous to start dates?
@TomStephensontraining3 жыл бұрын
Actuals are actual dates so you can enter them. If a relationship changed in real life then change it in the update.
@Popart-xh2fd3 жыл бұрын
@@TomStephensontraining You mean that that precedence needs to be changed.
@anandporle28512 жыл бұрын
how to calculate the overall project planned % and actual progress %
@TomStephensontraining2 жыл бұрын
Are you looking where the information is? It is in the tracking screen. Or are you asking how they are calculated? If so ill try to answer in another video
@anandporle28512 жыл бұрын
how to calculate the planned % Actual % of the project
@TomStephensontraining2 жыл бұрын
Are you looking where the information is? It is in the tracking screen. Or are you asking how they are calculated? If so ill try to answer in another video
@itself10243 жыл бұрын
Hello Mr Tom, are you there? i really need your help
@TomStephensontraining3 жыл бұрын
What’s up?
@itself10243 жыл бұрын
can we communicate via email, so i can send you what i did and you can correct me please.
@mahermonir-e2u4 ай бұрын
can you please make access to this project
@TomStephensontraining4 ай бұрын
Hi Maher, go to my ms project the course playlist and in the description of those videos I have download links so you can follow along.
@mahermonir-e2u4 ай бұрын
@@TomStephensontraining Oh yeah,thanks so much
@albertmabuya63482 жыл бұрын
how can i contact you tom
@TomStephensontraining2 жыл бұрын
Hi Alberta, check out www.TCIC.ca i teach msproject live online at different times