Рет қаралды 2,171
Walker & Son hauling a 45.5m long x 78t bridge beam with their Volvo FH 750 connected to a double bogie set up via a fifth wheel coupling.
The beams being moved on behalf of Collett & Sons, were loaded at Cleveland Bridge’s manufacturing facility in Darlington, North East England and transported 230 miles south to a new junction under construction (J7a) on the M11 in Harlow, Essex.
This was the fifth and final beam to be delivered to this site.
Escort Vehicle & Video©️
www.priestabnormalloadservices.com