Рет қаралды 121,121
In this video, I have covered the details of trains running between #Visakhapatnam and #Kirandul Railway station. Visakhapatnam Kirandul passenger train was started in 1968, Visakhapatnam Kirandul express train was started in 2018. Both of these trains will run with electric loco end to end. Currently, Visakhapatnam Kirandul railway line is partially doubled.
Visakhapatnam Araku Ghat Section Railway Line in Map - 3D View
• Visakhapatnam Araku Gh...
Follow us on Instagram: / techchaitu
Like us on Facebook: / techchaitu
Note: All the information is taken from different sources and this channel do not claim for the 100% accuracy.