Little bit of a rougher/quick edit on this one, what ya guys think? good enough or should I spend more time making it smoother? I think it still conveys the same info, so if I can do them like this, might be able to put them out faster.
@CloudiiPandaАй бұрын
Did you do a fireblock? I have my rigid foam up and framing done, I'm confused on the fireblocking issue. Wondering what you did?
@SomeGuysGarageАй бұрын
Did you watch part 5? It shows more of the insulation details. The stack up though is 1" XPS foam glued to foundation, small air gap, 2x4 framed wall with roxul R14 in the stud bays, then drywall on top. Rim joist area is 1" ish of spray foam for sealing and then R22 roxul in front. Ceiling has 3.5" safe n' sound filling it in. I didn't do any fireblocking specifically, none of these walls are load bearing and everything foam is covered with drywall/roxul which met code here with the inspector.
@CloudiiPandaАй бұрын
@ yea I watched part 5 but it was a while ago. Thanks for the info!