Рет қаралды 72,626
#unvented #plumbing #heating
In this video I take you though a full central heating and hot water installation with Hot Water Priority setup using an Intergas Xclusive combi boiler and Joule High Gain unvented cylinder.
This setup recharges a 125L cylinder in around 10 minutes and gives 20L flow rate - that allows use of 2 showers at the same time.
When using only 1 outlet you pretty much never run out of hot water.
On top of that heating works on 55C flow and is Open Therm for better modulation.
The boiler is set up to 6kW heat loss (Heat Loss of the property)