Рет қаралды 6,694
In this video we take a look at the engine installation and the SMX instrumentation on the Speed Twin, then we head out for a Sea Trial. This repower was done by Seaboard Marine during the Winter 2020. We didn't capture a lot of footage of this project in progress because the boat is too big to trailer to our yard. The work was done in the harbor with the boat in the water. Enjoy!