Another concise, informative and relaxed professional installation update. Nice one Rich, and thanks. I'm now looking forward to the big transformation in the next vid.!!
@kevanswift7797Ай бұрын
Nice to see your electrician using oval conduit to protect their cables. So many just clip the cable to the wall. Looks so much better in conduit. 😊
@paulf2529Ай бұрын
The only correct way to do it IMO and should a fault occur, a new cable can usually be pulled through using the old as a draw wire.
@BLAZERSEAMSАй бұрын
MONUMENTAL ... OR ... MOMENTOUS. take your pick old bean. But, again, a great educational and entertaining video.
@tkthebear984Ай бұрын
Very educational video Rich, although I’ve never been a great fan of underfloor heating, I prefer rads. Is that red pipe a specialist pipe for underfloor heating? Looking forward to next weeks video 👍
@donoconnor4204Ай бұрын
Great viewing as always!
@chr1srugbyАй бұрын
I'm sure it's just personal preference and you know this already but a lower gauge vapour control layer is enough on top of the insulation sheets (I think I used 500). Supposedly it's just to stop the foil from reacting with the screed, forming bubbles and weakening it. It might be easier to work with the 500 gauge on corners than the 1200 gauge dpm. Either way, a great video as always. I learn loads every week. Thanks!
@Mr_A_BuildersАй бұрын
When you’ve already got a part roll left it’s not cost effective to then purchase a lesser gauge DPM. 👍🏻
@chr1srugbyАй бұрын
@@Mr_A_Builders I did wonder if that was the case! Fair enough! 😅
@buzzkillington3354Ай бұрын
Looking good rich 👍
@pat_link_Ай бұрын
Great Job 👍
@kevinkvs9746Ай бұрын
Here we go 🎉
@paulf2529Ай бұрын
The screed company made a tidy job.
@Peter-ho1osАй бұрын
Excellent stuff
@LTFC1964Ай бұрын
Great again Rich. Out of interest, when they leak test have they ever had a leak and if they did, do they need to replace all the pipe or can you do a local repair.
@Mr_A_BuildersАй бұрын
They’ve never told me they’ve had a leak during test but he did tell me when he was there he’d been out to a repair where a tradesperson had drilled through it once it was installed so it can be repaired. 👍🏻
@freeform33Ай бұрын
That explains the process precisely 👍🤓
@jamesgibbons5552Ай бұрын
I saw another video recently where UFH was being installed and they said you should put it over the whole floor (including under cabinets/islands etc) as it gives you flexibility if you want to rearrange your kitchen layout in the future. I can see both sides of the argument to be fair.
@Mr_A_BuildersАй бұрын
I think that depends on the space you have and if you have the potential flexibility to change the space and then I suppose that would make sense. I wouldn’t put UFH under my cupboards though. 👍🏻
@KEVIN-x9nАй бұрын
Spot on video to short
@mrboyban18 күн бұрын
Hey pal, I'm filling up the system at this time of the year, prior to laying the liquid screed. Do you know if the inhibitor antifreeze is really necessary to be add on? thanks in advance....
@johnshepard6682Ай бұрын
What’s happening with the basement build and will you be starting any new jobs before Christmas?
@Mr_A_BuildersАй бұрын
There’s a few things left to do to completely wrap up there so we may do a final walk through for completion soon. 😂
@Jazzy-xr1szАй бұрын
Great vid as always Got a question though , if it 200 mm separation of pipe for a traditional boiler but less for a ashp, what happens if you add a ashp later ?
@lazylad8544Ай бұрын
Under floor heating never had that in my day. Whats the matter with all these people. Get your slippers on be reet. 👍👍
@kevinkvs9746Ай бұрын
😢😢 too short
@Mr_A_BuildersАй бұрын
Sorry Kevin but this part of the job didn’t mix very well with what’s coming next week. 👍🏻
@kevinkvs9746Ай бұрын
@ I understand bud I’m just bored 🤣
@Mr_A_BuildersАй бұрын
😂it’ll be a good one next week mate there’s a lot gets done to change the space so try and hold out. Have a good week Kev 👍🏻
@Guvnor100Ай бұрын
Funny pause during the slump test?
@Mr_A_BuildersАй бұрын
Sorry about that but I had no other way to listen to what our UFH engineer was saying about the slump test. I didn’t want to put him on camera too long he wasn’t comfortable doing it 👍🏻
@Guvnor100Ай бұрын
@Mr_A_Builders ah OK, I almost started playing around with my phone thinking it was lagging
@davidquirk8097Ай бұрын
Trust extra layer of plastic is often called the slip sheet. The idea is to stop the Gyvlon from sticking too, or reacting with, the Aluminium foil on the insulation below. It serves double duty of preventing the screed from leaking down in any cracks there may be in the insulation if someone has missed tapeing a joint. On the last four floors I've done I've followed the British Standard and pressure tested the floor to a higher pressure than you'll get from garden hose. I also fitted a temporary pressure guage to the system so I could check there was no pressure drop over 24 hours.