Working in a 2000A widow maker

  Рет қаралды 349,423

Residual Electrical

Residual Electrical

Күн бұрын

Пікірлер: 505
@llamedosr7843
@llamedosr7843 3 жыл бұрын
I suspect you've been recommended because I watch photonicinduction, dont let him anywhere near that panel, he'll probably blow it up. Keep up the good work young fella's
@srosenow98
@srosenow98 3 жыл бұрын
He'd for sure find a way to "crank it up stupid!"
@chrisharlin4895
@chrisharlin4895 3 жыл бұрын
You're right he would say hold my beer I'm fixing to crank it up to way stupid and laugh because that is what he does don't get me wrong I like his channel I like how he pushes things and teaches at the same time but he is not a electrician nor should he be around that size of box
@hsvhel
@hsvhel 3 жыл бұрын
@@chrisharlin4895 He is far more qualified to do what he does than an Electrician.....Far more
@jarredri
@jarredri 3 жыл бұрын
Andy would say we going to crank it right up till it pops---- I popped it he would say
@RyanCampbell-ve8yz
@RyanCampbell-ve8yz 3 жыл бұрын
"We've popped eit..."
@jyuvgrace5364
@jyuvgrace5364 2 жыл бұрын
Stripping cables. Brings back memories. First time I stripped a cable(35mm 4 core) I handled the knife the wrong way while stripping. Pulled it towards myself instead of pushing it away from me. The knife slipped out and I cut my thumb from the top to the base of the thumb, bleeding all over the place haha... Used insulation tape to tape it up. Dumb mistake that I never repeated again. Could have been much worse, glad it wasn't and can have a chuckle at my own dumb expense later on.
@countryhick1011
@countryhick1011 3 жыл бұрын
this is def the best electrical channel on the tube. Proper Electrics mate
@vlad1889
@vlad1889 3 жыл бұрын
In UK, this is so different to US...Not even in the same ball park. Your "Industrial" is for us a 600-800 amp multi-dwelling service and even that is far more intricate. I love to watch how stuff is wired in different countries incase I ever move.
@jurassicsparks5220
@jurassicsparks5220 3 жыл бұрын
@@vlad1889 and my industrial would supersede yours. Try working on Mercury arc rectifiers 👏👏👏
@uplightuk8924
@uplightuk8924 2 жыл бұрын
@@vlad1889 US electrics is way easier than UK electrics - I’ve worked on both
@SuperVstech
@SuperVstech 3 жыл бұрын
The boss may go mental with the time spent, but WOW that panel now looks like it will be far easier to work in, trace, and care shows. Well done.
@BTW...
@BTW... 2 жыл бұрын
You know what you tell 'the boss' that wants you to do sub-standard work and ignore obvious wiring code violations without addressing the matters? (multiple issues still present after the feed to a new DB installed) You know what you tell the guy that quoted the job and failed to include addressing an unsafe installation, and then expected another tradesman to turn a blind eye to the flaws?
@Gringle_
@Gringle_ 2 жыл бұрын
@@BTW... what do you tell them?
@Maxis196
@Maxis196 2 жыл бұрын
@@Gringle_ lmao
@porscheGT652
@porscheGT652 Жыл бұрын
@@Gringle_ I can tell you're a 12 year old edge lord lmao do yourself a favor and gtfo the internet and look at grass or something.
@Gringle_
@Gringle_ Жыл бұрын
@@porscheGT652 You're projecting, you sillly little Billy!
@ZG0002
@ZG0002 3 жыл бұрын
I miss working on stuff like this, you know things are getting serious when the socket set comes out. Nice tidy up and finished job. 😀
@coulombicdistortion1814
@coulombicdistortion1814 3 жыл бұрын
Good on you for taking the time to sort out the small details. Like giving the wires tie-wrap supports and tidying up the CT wires.
@BTW...
@BTW... 2 жыл бұрын
The CT metering wiring should have been totally removed and redone properly. Whoever installed that was a hack and had no idea what Standards apply to such circuits.
@tarikwasthere
@tarikwasthere 3 жыл бұрын
No idea how this came up on my feed but I watched the entire thing and loved it!
@davidca96
@davidca96 2 жыл бұрын
High voltage is something you should never lose fear over, so that respect is never lowered. You do great work, thanks for sharing.
@AngeloXification
@AngeloXification 2 жыл бұрын
Meanwhile Im weary of working on my small 24v system
@champ8605
@champ8605 2 жыл бұрын
low or high it doesnt matter dont fuck around with any of it. in saying that this is still considered low voltage because its only 3 phase but high amps.
@gordonm2821
@gordonm2821 3 жыл бұрын
A couple of years ago we were demolishing two of our buildings at work which housed large technical facilities so each building had its own Ring Main Unit to isolate it from 11kV ring going round site and a dedicated transformer feeding each buildings switch rooms. When SSEN came to remove the RMUs and transformers they isolated the HV network further back on ring. So how do you prove an 11kV cable is dead before disconnecting it from RMU? Turns out you clamp what looks like a chisel to the outside of the cable, insert an explosive charge and pull a string to detonate, forcing said chisel through the insulation to short all the conductors together. What a fun day that was!
@rustblade5021
@rustblade5021 3 жыл бұрын
yep it's called spiking
@defgrant
@defgrant 2 жыл бұрын
We use a high voltage tester attached to a hot stick with the 40cal suit on but we are doing maintenance. Once zero potential is confirmed the ground chains go on.
@letsgocamping88
@letsgocamping88 2 жыл бұрын
did the ring get rejoined? if you had a split ring then you would have resilience against an HV fault as you could switch out the faulty section at the RMU's
@petercampbell4220
@petercampbell4220 2 жыл бұрын
Beats 12' steel spike and 2 guys in flash suits one with spike, the other with sledge hammer.
@gordonm2821
@gordonm2821 2 жыл бұрын
@@letsgocamping88 - SSE put in an HV joint where ringmain units were to complete ring
@pyrounlimited7035
@pyrounlimited7035 3 жыл бұрын
I realy like your content mate you are possible the only european ''industrial'' electrician on youtube keep up the good content.
@sparkymalarky4322
@sparkymalarky4322 3 жыл бұрын
A couple years ago a shopping centre here in Australia had a similar setup with those fuses in that oil filled switch. They changed the fuses out and when they went back in they ended up getting damaged and shorting across the phases. It caused A massive arc flash and killed 2 of them and the 3rd guy was severely burned. Sad to hear it happened over there too
@Kris-qr5hw
@Kris-qr5hw 3 жыл бұрын
Morley, that was a sad day for the industry, has brought some interesting changes to work practices.
@ianhill20101
@ianhill20101 2 жыл бұрын
Got a picture on my phone of a board that blew in the night got a a call out next morn to take a peek, one side the fuse was loose and making a arc less than a 1mm but it grew and got hot then ended the panel took around 15mins start to finish
@Danny-204
@Danny-204 3 жыл бұрын
I do work like this on a daily basis, which is fantastic and I really enjoy it, but I was sent to connect up a heating system today in a house, and did not have a clue. Haha. I am so out of touch with domestic wiring. Good work guys,
@samirkattach9801
@samirkattach9801 2 жыл бұрын
I’m pretty good at heating systems, but this stuff I wouldn’t have a clue lol
@southwest3369
@southwest3369 3 жыл бұрын
This is a channel for proper sparks, no twin and sling lifting floorboards like a melon head here! Did you do a proper industrial electrical install apprenticeship? Because you have a lot of well crafted skills very methodical, especially for a younger lad I’d have you on the rigs with me any day.
@garry2115
@garry2115 3 жыл бұрын
Hi Mike, Excellent installation as usual! Very explicit and informative! You and Cam work brilliantly as a team! Always look forward to your uploads. My go-to electrical channel! Bring on part two! Take care. See you next Sunday! 👍⚡️
@knack8284
@knack8284 2 жыл бұрын
I promise you dont need that many exclamation points but at least i get how much you like this video
@0dbm
@0dbm 3 жыл бұрын
10 point test, I liked it Nothing like working on something that can kill you Good work
@R.Daneel
@R.Daneel 2 жыл бұрын
Yeah. Many years ago a driving instructor told me, "assume every other driver is having a really shitty day". I'm the only one in the house and I *still* check with the meter right after I am 100% sure I just turned off the correct breaker.
@thetomster7625
@thetomster7625 2 жыл бұрын
maybe I only find this incredibly enjoyable, because I'm an electrical engineer, but I believe we need more youtuber like this to get people into the cool parts of manual labour. This is so much cooler and more satisfying then most desk jobs... and even pays good if you are not afraid of actually working. Get into it people - I would have, if I didn't get the chance to step up into design and development.
@Ornithopter470
@Ornithopter470 2 жыл бұрын
At least stateside, it's a literal nightmare getting to the point where you're doing this sort of thing. Unless you're a licensed master electrician, you're going to be stuck doing most of the crappy parts of this kind of work. For every little comparative money, for a very long time. It takes longer in the US to become a master electrician than it does to become a nurse. He also cuts out most of the really unpleasant parts. Like getting the cabling in place, or cut. Not to mention doing this sort of work when it's 85+ degrees Fahrenheit and 90% humidity is plenty to get a lot of people out of the field pretty quick. Why would you WANT to work in godawful conditions for average pay at best?
@thetomster7625
@thetomster7625 2 жыл бұрын
@@Ornithopter470 simple answer: because you see what you have done at the end of the day... I only create a bunch of paper/data and hopefully every half year or so an actual finished design step, which is then printed and produced. Start to finish usually takes us - in my field of work - about 3 to 4 years. Its very hard to see progress in that kind of environment.... so most days are full of work and meetings that leave you brainfucked and you can't tell what was acomplished. don't get me wrong: I enjoy my job, its interesting, challenging, pays well and actually fun, most times. but getting home after only a couple of days, having finished something good looking as this, just lets you sleep better. and ultimately, this is sometimes more important, then making a little extra money. Also: Obviously I can't speak for the US, but in Europe (UK, Germany, etc) this kind of work actually doesn't pay that bad and its easier getting to a point where you are a master. There is a huge shortage of labour workers here and thus they can make quite big prices these days - so: get over here and enjoy the craft as its supposed to be :)
@kapower06
@kapower06 2 жыл бұрын
@@Ornithopter470 This is why you join the IBEW and go through the apprenticeship program.
@Ornithopter470
@Ornithopter470 2 жыл бұрын
I am quite aware of the IBEW's apprenticeship program. It's still pretty awful.
@kapower06
@kapower06 2 жыл бұрын
@@Ornithopter470 What local are you? 10,000 hours of training plus 64 hours of college credit all while getting paid is not awful.
@martinstaples5989
@martinstaples5989 3 жыл бұрын
I look forward to these every week, you and photonicinduction are by far the best Sparky's to learn from!
@OJHussick
@OJHussick 3 жыл бұрын
Jesus. What are you learning from Photonic Induction? How to hoover up during a fire? 😁
@BenCos2018
@BenCos2018 3 жыл бұрын
@@OJHussick lmao well or what not to do
@train4905
@train4905 2 жыл бұрын
Wow that brought back some good memories ,i loved working on those old boards
@mikeselectricstuff
@mikeselectricstuff 3 жыл бұрын
Is it just because it's an old panel that there isn't an insulated cover over the incomers to allow it to be opened up just by opening the isolator? Seems crazy to have to get the DNO in just because of the lack of an internal cover.!
@farmersteve129
@farmersteve129 3 жыл бұрын
I've knocked up a bit of paxolin to go over the incoming terminals for such situations in the past - usually as a "U" shape to cover the sides too.
@scottsparky1
@scottsparky1 3 жыл бұрын
ive worked on them before and made a cover for the live terminals. you just have to watch what your doing its no big deal
@timg6850
@timg6850 3 жыл бұрын
The original problem as I understand it, there was a Fire at one of the Warehouses caused by an electrical fault and because the Earth loop impedance was too high the Breakers at the Mains didn't trip. I think converting the original 2000 amps Main into a more standard 630 amp Main by using a panel on the side is an elegant solution, makes things safer to work with and most importantly solves the original Earth loop impedance problem.
@ZG0002
@ZG0002 3 жыл бұрын
@@residualelectrical Have to agree, I worked on something similar at Beamish Museum connecting into a Submain. Was getting pressure from the company not to isolate due to it knocking off a whole section of the open air museum (had to drive to the isolation point and call my apprentice so make sure I'd locked off the correct supply) opened the panel and found it similar to this no covers and just not a good idea to be throwing around socket sets etc in. My boss turned up and once he actually saw it opened up he backed down and agreed I'd made the correct call. Wasn't off for that long and was completed safely, sometimes you have to just stand your ground and do things right! The consequences for getting it wrong while working live just aren't worth it.
@filipmecir262
@filipmecir262 3 жыл бұрын
@@residualelectrical oh, in our area (CZ, distributor EG.D) we don't pay for shutdown. Same aplies for isolation of LV overhead line (e.g. roof work).
@want4onlyone
@want4onlyone 2 жыл бұрын
Nice work. Thanks for the vedio showing how to do it the right way. Its so good to see someone that takes pride in their work. You are a true craftsman.
@cristianbacu4010
@cristianbacu4010 3 жыл бұрын
Yeah, man. Here to absolutely commend you for you being a pro at a young age. I am in process of installing some 240mm2 Al myself right now. Brutal crimping job. Rock on!
@georgebadea4138
@georgebadea4138 2 жыл бұрын
Good luck; I in Romania, gathered some chinese 18 tons pres, wich, cyabi bend to 240; It says it should crimp 300, so... take care!👍
@cristianbacu4010
@cristianbacu4010 2 жыл бұрын
@@georgebadea4138 Eu am una bulgărească...😅
@PatrickDickey52761
@PatrickDickey52761 2 жыл бұрын
That's where a good set of hydraulic crimpers comes in handy.
@metrotechguru5863
@metrotechguru5863 3 жыл бұрын
You lads have turned that cabinet into a proper electrical installation. Good on you.
@artisanelectrics
@artisanelectrics 3 жыл бұрын
Nothing more satisfying than hoovering out 20 year old swarf from the bottom of a board 😁
@ste4414
@ste4414 3 жыл бұрын
Has to be Cory this comment haha
@bobcervante3801
@bobcervante3801 3 жыл бұрын
Unfortunately very common to find a new control panel with buzzing motor starters/contractors due to swarf. Here in the UK far too many electrical companies drill gland plates with hole saws while in place.
@nickhill7739
@nickhill7739 3 жыл бұрын
Good content 👍. FYI you are getting a “continuity” reading through the LV windings/ neutral earth connection. The transformer is only earthed on the HV side as part of the isolations 👍👍
@michaelseecy5904
@michaelseecy5904 2 жыл бұрын
Hi Nick, trying to understand a bit better. Why do the phases and Neutral/earth have continuity in the 10 point test? Like you said the HV was isolated, but on the LV side of the trany, even if each of the phases were isolated, wouldn't there be no continuity between the points he tested?
@rickycunningham6368
@rickycunningham6368 3 жыл бұрын
Great video dude. How are you, hope you had a great holiday, and birthday, youve done a good job mate. You should do a video about going self employed and giving tips about it, just For those that are in The industry and wanna take The plunge, as itll give Them The info they need. Keep it up dude
@BitwiseMobile
@BitwiseMobile 2 жыл бұрын
I was an AT in the US Navy and the highest power I had to work with was 400V/20A for RADAR and related FC systems, but I respected the hell out of that 20A (and the voltage was pretty high too). 2KA is insane! With just a single volt of potential that would supply 2KW of electrical energy!
@uasueuej13
@uasueuej13 2 жыл бұрын
Would be even more than 2kW, if cos phi is 1 and p=root3*U*I (cos phi probably isn’t 1 though, depending on what its powering)
@Ornithopter470
@Ornithopter470 2 жыл бұрын
Carriers have 13kV distribution these days. It's nuts.
@johnhagen31
@johnhagen31 2 жыл бұрын
I'm not trade, but a 68 year-old who never gave a thought to the complexities and dangers of power supply. That was until a guy from Merlin Gerin dropped a huge spanner across the output of a diesel UPS he was commissioning for us (at one of Whitbread's old data centres). Hell's teeth! The mega-flash & bang which shook the building and killed all power stone dead for several hours. Nobody hurt but many new pairs of pants needed that day!
@andyxox4168
@andyxox4168 2 жыл бұрын
Love the ‘look away when using the bandsaw’ PPE instead of the more normal safety glasses … 🤔
@flat4-
@flat4- 2 жыл бұрын
Oldschool wire stripping with a knife, nice. Remembers me on me first job, 30 yrs ago in the (now demolished) Opel factory in Antwerp. We had an amazing time there as service technicians/electricians, servicing the car plant and general maintenance of the factory. Full continuous shifts 24/7.... My first real paid job, as an 19yr old earned around 60,000 Belgian francs wich was a fortune back then.....
@ThePhoenixAscendant
@ThePhoenixAscendant 3 жыл бұрын
You know, doing videos like these are great demonstrations for trainees and awesome if your boss ever calls your work pants. XD
@Zensight
@Zensight 2 жыл бұрын
Thanks a ton for the excellent video/quality! Was also curious what your pants and the low-profile belt storage are? Couldn't find on the tool shop
@janlievens6964
@janlievens6964 3 жыл бұрын
Great video right up my street, as an Industrial Electr. Inspector for 50 y,AP Controller,Design Engineer inspector,Inspection and testing organizer, Manufacturer Inspections All over the world prior to delivery and finally signing off the completion Certs for some off the biggest jobs in the UK (all airports Including T5 new build,Power stations Hospitals and so on) but now sadly retired LOL.
@LHoover
@LHoover 3 жыл бұрын
Tip tops Gentleman. Something to be said for the Queen to provide proper functional safety equipment. Thankyou from the Pacific time zone.
@pauljarrett2849
@pauljarrett2849 3 жыл бұрын
Must be your best video so far Mike; great to see the UK PN guy doing the isolation too. Waiting two weeks was tough 😉 but well worth the wait!
@rn5666
@rn5666 3 жыл бұрын
Never seen anything like this being just a house basher, wicked video real interesting 👍
@Fester_
@Fester_ 2 жыл бұрын
I would love a shed like that, with no power, in my council back garden - with a little ' Danger high voltage ' sign on the front and a luggage padlock on it.
@BLMCFR
@BLMCFR 2 жыл бұрын
I had to work a 2000 A 440 V panel hot. It was in a hospital and could not shut down the power. No, I am not crazy, just confident I know what I am doing.
@kailashbtw9103
@kailashbtw9103 2 жыл бұрын
Such a cool video i couldnt stop watching!!! Some of those older panels can be pretty damn wild
@robertpilkington4442
@robertpilkington4442 3 жыл бұрын
The earth on the HV system has nothing to do with the LV terminals "ringing out". The HV windings are completely insulated from the LV. The LV transformer windings are of negligible DC resistance and as the transformer LV winding is star connected, you would be concerned if you didn't get a "short" between the connections on the incoming tails! are
@swsuwave
@swsuwave 2 жыл бұрын
@@residualelectrical From 60Hz Delta-Wye land here- I was surprised you 50Hz guys don't have lock-out tag-out rules, basically if YOU are working down stream from the [off] distribution Xfmr, YOUR [usually red] lock goes on the operating handle or door to get to the handle, YOU have the only key, thus preventing any stranger saying "huh, no power, i'll just turn it back on" while you're torquing inside the 2KA panel. If multiple workers are involved, a gang lock plate holds each persons lock and can't be opened until the last lock is removed. Thats always part of starting work safety briefings. Our 480V switchgear sure looks different even though it does the same functions - nice tour + fine work!
@zaxmaxlax
@zaxmaxlax 2 жыл бұрын
@@swsuwave In France you're mandated to pad lock everything you're working on.
@swsuwave
@swsuwave 2 жыл бұрын
@@zaxmaxlax in the US, you must use your lock, your key - I saw the grid worker put on their lock & gave their keys to the worker, but that's not ok here because the workers don't know where all keys in existence are, like if the grid people use a common key. All US safety approved lock-out/tag-out locks are keyed different so nobody but the worker can remove his/her lock. The lock cylinders have extra pins to allow manufacturing different keys.
@lazu2819
@lazu2819 2 жыл бұрын
@@swsuwave I think the keys in that brown envelope were to the locks on the HV disconnect.
@BTW...
@BTW... 2 жыл бұрын
@@swsuwave Well, such lockout rules do apply here and the UK. That lockout has been applied at the HV isolator and tag applied. The Supply Authority guy that disconnected did that.
@Mercmad
@Mercmad 3 жыл бұрын
I know what a flashover looks like. 45 years ago I was apprentice in a large engineering company. Our shop had a large switch room separated with a fireproof door with small window ,6" sq in it. An electricians apprentice was working outside in the yard ,digging tar seal out of a in ground cable duct. His pickaxe went straight into one of the cables ,he wasn't injured but the switch room exploded . The light from the arc ,through that tiny window, lit up our shop for an instant. There were several big boxes like that and all were fried.
@andyxox4168
@andyxox4168 2 жыл бұрын
You’ll only get a really good arc flash if you’re using ACBs of similar that are not fault limiting, once there’s a fuse in the circuit the energy let through is very limited.
@mccarly3258
@mccarly3258 3 жыл бұрын
I feel so lucky I get to spec my own cable because tri-rated cable is a billion times easier to work with but saying that props to you dude. That was a nice tidy install.
@christhrashmetal8260
@christhrashmetal8260 3 жыл бұрын
Excellent work brother respect ✊ and love for electricity ⚡️💪💪⚡️🪛🔌💡greetings from Greece mate
@sandman873
@sandman873 3 жыл бұрын
Best spark on KZbin, hands down 👍🏻
@danielelise8051
@danielelise8051 2 жыл бұрын
That switchgear gives me the creeps, I'm surprised there wasn't someone stuck to it rotting away,eeeckk! 🔌⚡🔌⚡
@ste4414
@ste4414 3 жыл бұрын
Old colours for three phase was well more identifiable in my opinion.
@whatevernamegoeshere3644
@whatevernamegoeshere3644 3 жыл бұрын
The problem comes with international markets. If you bought a product from hungary and wanted to put a new plug on it, in the UK, in the US, in Russia and some of the balkan you would have made the chassis live because our red was earth while others used that for lives. Colours were absolutely all over the place. Also blue has been neutral for a good portion of europe since the early days, that really doesn't work well. These are the things that resulted in the current system.
@randacnam7321
@randacnam7321 3 жыл бұрын
@@whatevernamegoeshere3644 The problem is that the IEC standard colors are garbage. All of the colors are dark, and there is a very real risk of not just transposing phases but transposing a phase and neutral. I've seen old IEC color spec cable and distinguishing what wire is what is not easy. The old British colors (red/yellow/blue hots black neutral green ground) were much better. The American colors (black/red/blue hots white neutral green or bare ground for 120V/208V; black/red hots for 120V/240V single phase 3 wire; black/orange/red hots for 240V high leg delta; brown/orange/yellow hots gray neutral green or bare ground for 277V/480V; brown/purple/yellow hots for 480V high leg delta) are the best out there right now. White or gray neutral, green or bare ground, anything else may kill you.
@kierangaston9494
@kierangaston9494 3 жыл бұрын
@@randacnam7321 shamefully i have to admit in a rush on an events job with doors at opening 8am working in a dark cupboard i put phase to neutral and lets just say the client with a large array of tvs wasnt happy
@whatevernamegoeshere3644
@whatevernamegoeshere3644 3 жыл бұрын
@@randacnam7321 Quite frankly the US colour system is hot garbage so let's not even bring that up, most of all with cross-country compatibility. That's your opinion, okay, completely ignored what I said, that's fine but just think for 2 minutes. Like just for starters what if you end up with a UV damaged cable? Something can become white or grey in the summer sun of 10 years so it's an absolute no-go for a neutral colour, if it can be a faded live. Also yellow-green is the best thing for earth because that's the only patterned cable. Also blue and green fade the same way in the dirt and sun so you might end up with a blue live wire on earth then. Then there's monochromatic light, like old sodium lights where you cannot recognize colour, hue or saturation just brightness. There it will save your ass. You have no clue how colour or pigments work mate. All you want is colours that are mildly more convenient in the best possible case.
@randacnam7321
@randacnam7321 3 жыл бұрын
@@whatevernamegoeshere3644 In a lot of permanent building wire, ground isn't even insulated so fading can never be a problem. And our blue insulation is often a lot brighter than the blue used in IEC spec cable. The worst issue I've seen in fading is with yellow wire, and that is why 277V/480V uses gray as a neutral. Plus, American practice is to put wires where they can't easily fade. Even where they do, white and black are real easy to distinguish and red is still visibly pink. There are a lot of bright colors out there for wiring insulation, and one of my main greps with the IEC color spec is that they use none of them to contrast with the dark blue. And apply your LPS example to IEC colors: L1, L2 and neutral look identical. Even L3 may be hard to distinguish. The only thing I have no complaint about with IEC colors is the yellow green striped ground, and even then it could be improved as IEC spec says the stripe cannot twist around the cable. It should twist or at least have multiple smaller yellow stripes, as otherwise it can look like just green or just yellow in a bundle or loom.
@ooluke89oo
@ooluke89oo 3 жыл бұрын
Just came across this channel, nice content & craftsmenship on industrial work, makes a change from the house bashing channels. I just rewired my house & reminded myself exacly why i dont do domestic work anymore.
@jackglossop4859
@jackglossop4859 2 жыл бұрын
a 10 point test should always be followed up by chucking a damp twig on it.
@burningdust
@burningdust 3 жыл бұрын
Nice old I-Line built like a tank. 230/400v system? That utility transformer looks a little scrawny. Always interesting to see how it’s done in other parts of the world, Milwaukee makes a beautiful power crimper.. worth every penny for the professional Crimps it turns out. Cheers from 🇨🇦.
@untermench3502
@untermench3502 2 жыл бұрын
A personal tale: In the early 70's, I was helping install some equipment in a large warehouse. I asked the supervisor where the AC supply was and he pointed to a very large box on the wall. I opened it an saw that the fuzes were the size of beer cans and a notice said that it was 600v 3 phase. I wanted to determine if it was hot and I didn't have a volt meter on me, so I noticed some wire on the floor. I picked-up a 2 foot or so length of 1/0 ga. insulated and put it across the outer legs to see if I got a spark. This fireball jumped out of the box and covered me with molten Copper. It vaporized about a foot of wire in the process. I noticed later that there was a sub-station on the other side of the wall. I never made that mistake again.
@brockobama257
@brockobama257 2 жыл бұрын
How are you still alive
@fiercefix
@fiercefix 2 жыл бұрын
Wow man your so lucky to be alive interesting tale tho it might help someone else to never do that , I remember tales of when blokes doing gas pipework checking for leaks with a lighter 😱 crazy times back in the day .
@leeroybarbz
@leeroybarbz 3 жыл бұрын
Hey mate, awesome video! Just curious, did you do any testing on the existing 600A MCCB to see if it was still functional before doing the cable installation?
@zjzozn
@zjzozn 3 жыл бұрын
⚠️ why do I enjoy watching big electrical work? Well done chap 👍😎🥸
@idiotdrummer60
@idiotdrummer60 3 жыл бұрын
Nice video, brought back a few memories. May I ask why you didn't crimp the lugs onto the ends of the cables at the isolator switch before putting them in the trunking? That way it would've been a bit easier, and you could've chased the slack back towards the breaker.
@BTW...
@BTW... 2 жыл бұрын
And what happens if the lug face is twisted a few degrees out so it won't sit flat? Rotate the whole length of cable to get it right... or perhaps stick a screw driver in the bolt hole to twist force the cable stranding to comply? Do you do that sort of butchery to XLPE cables?
@equilibriumsound9725
@equilibriumsound9725 2 жыл бұрын
I work with "low" voltage DC (400-800VDC) builds and building audio/video infrastructure in studios- I do the exact same thing as you: "No one is probably gonna open this after I bolt it up, but it deserves the TLC!" One of my mentors as a teen always told me "if your cable management is clean, it sounds better!" Respect the extra effort and time for sure, esp as someone who often has to repair things where previously people haven't taken such care. Random question: What are those black gloves you're wearing? They look like an excellent fit and durable for a thin work glove!
@v2point0
@v2point0 2 жыл бұрын
Not only a widow maker but also, given the correct circumstances, a decent windowmaker in the wall its mounted to.
@tww5719
@tww5719 3 жыл бұрын
Very rare for someone your age to be clued up whatever you do 👍
@muppetpaster
@muppetpaster 3 жыл бұрын
BS
@Frazer.McLaren
@Frazer.McLaren 3 жыл бұрын
This is the most condescending bullshit. There are lazy people with terrible workmanship in every age group.
@Alexander_sparky
@Alexander_sparky 2 жыл бұрын
What a video. Best video I’ve seen on KZbin for this stuff 👍🏻 BY FAR.
@lukeashton7085
@lukeashton7085 3 жыл бұрын
Have you ever come across asbestos components within any boards you have worked on?
@frankblack1481
@frankblack1481 3 жыл бұрын
Top stuff. I’m sure I’m not the forst to say this, but when you’re talking over the music it sounds like Mike Skinner of The Streets about to ‘drop’ a ‘tune’. Is ‘Sparkeeze’ a new genre you’re going for?
@MKOMKONNNN
@MKOMKONNNN 3 жыл бұрын
the hands a shakes music rolls of into another realm
@robsodomy
@robsodomy 2 жыл бұрын
You guys don't have leather covers for your gloves in the UK?
@anthonyportillo47
@anthonyportillo47 2 жыл бұрын
My boy you make me wanna put in good work..respect
@kevinpickett7249
@kevinpickett7249 3 жыл бұрын
Great video all too often the short cut is taken for all sorts of reason but you now know it's right👍 times I've been into big boards and it's very tempting to just get the lid back on proper job.
@AngeloXification
@AngeloXification 2 жыл бұрын
2:52 those lights make my brain feel funny Beautiful cleanup of the box
@trone32
@trone32 3 жыл бұрын
I used to love heavy mains work. You did a great job on the tidy and install. 👍 you are quite right about the isolation requirements I have witnessed someone seriously injured as a result of poor isolation.
@alouisschafer7212
@alouisschafer7212 6 ай бұрын
What a panel... Happy to mostly work with Siemens Sivacon those are the best
@toomuchcake
@toomuchcake 2 жыл бұрын
I don't know how I ended up here but that was awesome to watch.
@edwardbarden4722
@edwardbarden4722 3 жыл бұрын
Keep up with your fluids guys while working. Nice panel work.
@floydbrandt1621
@floydbrandt1621 2 жыл бұрын
I was working on a panel that controlled two 100 HP motors thare was a buzzing I pushed in each contactor tighter still had a buzzing so I turned it off and the buzzing was behind me I turned around and looked and a large rattle snake was under the piping behind my leg I verry slowly moved out and got a shovel from my truck and chased it out of the building then went back to check out the control panel.
@AS-fm6iw
@AS-fm6iw 2 жыл бұрын
I worked in six flags terminating a 60kw transformer and striping the insulation my razor slipped and cut my arterie. Love these videos I feel like I'm doing it watching you
@derrick9635
@derrick9635 2 жыл бұрын
There is no mistakes only human error ,good your still with us .
@goham2558
@goham2558 3 жыл бұрын
This is why you get a proper electrical engineering FIRM to do your companies electrical
@TheSparkysdog
@TheSparkysdog 3 жыл бұрын
Great video buddy, love the attention to detail, looks a really neat job 👌
@cms4467
@cms4467 3 жыл бұрын
What is the hex set that you are using with the M12? Great video. Good to see someone who clearly has a idea of what they are going and isn’t just doing another video domestic car chargers and trying to make out they know what they are doing with solar. You do wonder if they would have been best to replace the entire panel for something safe and easier to work on. How much longer life span has that board got left especially considering the amperage going through it?
@cms4467
@cms4467 3 жыл бұрын
@@residualelectrical Thanks. Wasn’t sure that they would be long enough when I looked at them? Have you found anything for PZ2/3 terminals to use it with? Some of Schneider boards seem to like to use them. Just a thought would it have needed to have been that big? Not a complaint but you have only connected on to a 600amp and the rest of the out going ways are not that big so could you have used a 1000amp or similar? Don’t know if that would have made that much difference? Keep up the videos.!!!
@BTW...
@BTW... 2 жыл бұрын
@@cms4467 Buy a set of pozidrive screw drivers. They are not hard to find.
@perwestermark8920
@perwestermark8920 3 жыл бұрын
I have never done anything bigger than 4mm2 but I enjoyed the video.
@electrician247
@electrician247 3 жыл бұрын
I love these videos Mike. Great work and content mate
@echyboy123
@echyboy123 3 жыл бұрын
Wicked video mate keep up the good work 👍🏻 quick question do you work for yourself or for a company?
@echyboy123
@echyboy123 3 жыл бұрын
Yeah mate thanks for the reply keep up the great videos 👍🏻👍🏻
@tent7014
@tent7014 3 жыл бұрын
Yo dude nice job. I wonder if you could put a 3 phase supply into my expanding Ganja farm in Wolverhampton sometimes soon ?
@redonk1740
@redonk1740 3 жыл бұрын
Damn I bet that torque wrench cost more than my car.
@AlexanderBukh
@AlexanderBukh 3 жыл бұрын
yeah an absolute unit
@HansOvervoorde
@HansOvervoorde 2 жыл бұрын
Splendid. I wish more electricians worked like this.
@callummckenna8470
@callummckenna8470 3 жыл бұрын
Giving the head shrink pinch at the back once warm does work , again not ideal but can get it looking pretty smart
@blahh397
@blahh397 3 жыл бұрын
Nice to see some 'meaty' electrics. Can quite understand that you wouldn't want to be anywhere near those cables when livened up. I would be away standing in the next field!
@jamescross2229
@jamescross2229 3 жыл бұрын
Hi from NZ. Great video. That torque wrench was pretty flash, and you mentioned that you`ll download the applied torque values afterwards. Is the torque settings for the 185s into the MCCB pretty critical then? Cheers.
@jamescross2229
@jamescross2229 3 жыл бұрын
@@residualelectrical Ta. That makes sense - you guys are very professional all round.
@doncodman913
@doncodman913 3 жыл бұрын
Hi . Heavy duty job there jeez. What is the unit in the corner doing ? our factory has something similar with a breaker switch on the front . If this breaker tripped or someone knocked into it , as it by a door and very low down would it knock out the power to our factory do you think ? What is the purpose of it ? rgds Don
@alecturner2008
@alecturner2008 3 жыл бұрын
I wasnt a fan when I saw some of your earlier videos, don't know what clicked but I'm subscribed now. Might even spring for a tool bag from Load Out.
@Gunbudder
@Gunbudder 2 жыл бұрын
the land of "oops, i died". i'll stay way over here working with 3.3v and 50mA hahaha
@ForTheBirbs
@ForTheBirbs 3 жыл бұрын
Other than the tape option - 3:1 or 4:1 ratio glue lined heatshrink is great stuff if you can get it in the larger sizes.
@mikethemask1525
@mikethemask1525 2 жыл бұрын
How comes you brought two cores of each to the new board?? Also the new board what will that be supplying?? Good video very interesting work?
@tinarichards2885
@tinarichards2885 2 жыл бұрын
You need a Milwaukee M18 Cable Stripper, Cable Cutter, Crimper and Knock Out Punch
@rickmort27
@rickmort27 2 жыл бұрын
im a service electricians apprentice in the states, this shit looks wild stay safe!
@ChrisWright7701
@ChrisWright7701 3 жыл бұрын
Did you check the two cables that were fastened on to the sports where you found that arc flash on the side of the enclosure.
@jongurney
@jongurney 3 жыл бұрын
The previous sparked crossed the life out of that thread on the l2 eh. What a squeeler
@TheSoloAsylum
@TheSoloAsylum 2 жыл бұрын
I've done everything you did here only with the panel live the entire time, and I can't count how many times I've done it. I actually prefer to work panels live, it's keeps you sharp all the time. Also if my helper ever brought me an aluminum ladder into the electric room with an open panel it would be his last day.
@idontgiveaship2575
@idontgiveaship2575 2 жыл бұрын
Here in the Netherlands we have a ladder manufacturer who produces aluminum ladders coated clear, black or gray and they have a special line for electricians, they aren't aluminum but fibreglass. Yellow coloured. Don't know if that is the case in the video.
@guygfm4243
@guygfm4243 3 жыл бұрын
I love the work you are doing, had you thought about doing some sort of insulating guards around the in comer so that it would be safe to take the cover off live and utilise the main for future times?
@chrisnorth3458
@chrisnorth3458 3 жыл бұрын
Sometimes unless someone asks for something like that its not worth the risk, someone else might open it up and still get killed and then you get the blame for "modifying" it
@JasperJanssen
@JasperJanssen 2 жыл бұрын
@@chrisnorth3458 I was thinking that maybe they deliberately don’t have one of those, because you’re not supposed to be working on the main stuff while the incomers are live? Especially given those live incomer terminals are not otherwise boxed in, so if a wrench drops down… The danger in boards like this is probably not so much just touching the live bits - no matter how high that voltage is - but especially arc flash explosions. (Is it just 230V at really high currents? Or is it like 1kV?)
@BTW...
@BTW... 2 жыл бұрын
@@chrisnorth3458 Blamed for installing protective shrouding around incomer flags and busbars... that brings it up to modern Standards? And you suggest some lawyer would try to blame those that installed proper safety shrouding, rather than blame the dickhead that worked around it to get killed?
@BTW...
@BTW... 2 жыл бұрын
@@JasperJanssen That SCA was built prior to Standards that had shrouds mandatory. The very real danger is accidental contact to any of the 3 phases, or arc flash by some idiot shorting between phases. It isn't "just 230V" low voltage AC... and the prospective fault current is far higher than 2kA. It isn't High Voltage 1.1kV either. Can't you tell the difference between High and low voltage switchgear?
@chrisnorth3458
@chrisnorth3458 2 жыл бұрын
@@BTW... yes
@petero2693
@petero2693 2 жыл бұрын
In the 80s I was a guard at ball glass..electrician had to drill into a live hugh box.. could not shut factory down.... the guy looked nervous...supervisor was a bit away.....
@rondo122
@rondo122 3 жыл бұрын
good suprise on a Monday, lovely long video! neat job, would be happy if it was my installation you were working on!
@tubeDude48
@tubeDude48 3 жыл бұрын
At 34:00, you don't leave enough wire. It should square-off, not round-off. They can pull-way from the bottom. --- The at 40:30 looks good!
@iScoTT29
@iScoTT29 3 жыл бұрын
Great video as always! Have you tried using Tri-rated single core cable before? Would make pulling and bending the 185's in a piss case!
@KevinCoop1
@KevinCoop1 2 жыл бұрын
From US. I’ve never seen electricians use or even have an all aluminum ladder. Safety glasses?
@planetpeckham1
@planetpeckham1 3 жыл бұрын
Well, it didn’t come home, but at least we got a new RC vid!
@sbusweb
@sbusweb 3 жыл бұрын
+Residual Current Looks at first from the offset like the incoming 4 live cables (N L1 L2 L3) do not go through the same hole... The ferromagnetic problem/effect comes into play therefore -- in this case if the load on all phases was not perfectly balanced, there would be a net magnetic field around the neutral incomer creating current in the chassis etc... Is there actually a long slot in the metal back there to join the big and small hole for those 4 cables, therefore? I may have seen such nearer the back -- plastic-covered?, wasn't very clear...
@raypitts4880
@raypitts4880 2 жыл бұрын
@@residualelectrical HOW MUCH CURRENT pun WAS YOUR KNOWLEDGE
@MT_T991
@MT_T991 3 жыл бұрын
You are a breath of fresh air.
Terminating a 630A 3 phase supply - 185mm2 Parallel’s
57:56
Residual Electrical
Рет қаралды 70 М.
Upgrading a football stadiums electricity supply
51:13
Residual Electrical
Рет қаралды 48 М.
This mother's baby is too unreliable.
00:13
FUNNY XIAOTING 666
Рет қаралды 37 МЛН
Стойкость Фёдора поразила всех!
00:58
МИНУС БАЛЛ
Рет қаралды 7 МЛН
Я сделала самое маленькое в мире мороженое!
00:43
Кушать Хочу
Рет қаралды 3,8 МЛН
Зу-зу Күлпаш 2. Интернет мошенник
40:13
ASTANATV Movie
Рет қаралды 437 М.
How to support over half a tonne of SWA cable - Containment basics
24:44
Residual Electrical
Рет қаралды 12 М.
Does Current Flow on the Neutral?
23:03
Electrician U
Рет қаралды 1,1 МЛН
I worked a day with a pro LV cable jointer
27:22
Residual Electrical
Рет қаралды 71 М.
Genuinely Messed Up A Huge Fuseboard Change
21:03
N Bundy Electrical
Рет қаралды 23 М.
Commercial electrical fault finding
33:50
Residual Electrical
Рет қаралды 21 М.
How Ship Plates Become Millions of Nails: A Complete Manufacturing Process
23:02
I Think This Is Right Other Electricians Say Im Wrong
16:16
N Bundy Electrical
Рет қаралды 48 М.
Installing my favorite 3 phase distribution board
27:35
Residual Electrical
Рет қаралды 61 М.
Installing 3 phase transformer | Starting a Machine Shop 17
12:09
Erik Cortina
Рет қаралды 43 М.
This mother's baby is too unreliable.
00:13
FUNNY XIAOTING 666
Рет қаралды 37 МЛН