Very good update , this work was pending long time due to land acquisition but ,work is going fast . Even some places near adambakkam station 2 buildings needs to be demolished and then work will start.
@City_Breeze-12 ай бұрын
Yes. Thank you.🙏
@srijith53912 ай бұрын
Sir vanuampet to .adipakkam status Pl thank you srig
@Karalmarks_Pvm2 ай бұрын
Excellent update congratulations
@City_Breeze-12 ай бұрын
Thank you.🙏
@raghunathanv2362Ай бұрын
Very good explanation
@bennyj23592 ай бұрын
Very nicely explained with illustrations. Keep it up 👏🏻👏🏻👍🏻
@City_Breeze-12 ай бұрын
Thank you.🙏
@sabthagiriramanan7062 ай бұрын
Good detailing
@City_Breeze-12 ай бұрын
Thanks.🙏
@yoganjira13482 ай бұрын
Hats off to your hardwork
@City_Breeze-12 ай бұрын
Thank you so much.🙏😃
@gyogeshh2 ай бұрын
Excellent update, most complicated engineering challenge!
@City_Breeze-12 ай бұрын
Yes. Thank you.🙏
@KS-yk2mh2 ай бұрын
Appreciate your efforts
@City_Breeze-12 ай бұрын
Thank you.🙏
@arumugamb58442 ай бұрын
Super coverage bro
@City_Breeze-12 ай бұрын
Thank you.🙏
@abrahamyesa2 ай бұрын
Left, right, left, right, left, right... Nice bro... Keed do post.
@City_Breeze-12 ай бұрын
Thank you.🙏
@VelMurugan-uc8oy2 ай бұрын
Any updates on Tambaram Velachery(Guindy/Little Mount) metro current path
@anandasir2082 ай бұрын
Please update search keys Or description If i search with "st thomas mount rail" or mrts this video is not coming as result
@City_Breeze-12 ай бұрын
OK. i will do it. Thank you so much🙏😊
@saravanansathyanathan36642 ай бұрын
Taking more risk to telecast thank you brother for your risk
@saravanansathyanathan36642 ай бұрын
Good coverage
@City_Breeze-12 ай бұрын
@@saravanansathyanathan3664 Thank you.🙏
@City_Breeze-12 ай бұрын
Thank you.🙏
@krish96-032 ай бұрын
How the track line 1 and line 5 join in alandur and how it's seperate from st. Thomas mount station thats confusing. Either they lay new pillars and track for line 5
@City_Breeze-12 ай бұрын
line 5 is connecting in line 2 track. not in line 1. Thanks.
@rajasekar6708Ай бұрын
@@City_Breeze-1 Yes, you're right. But what is the need to construct a new St.Thomas mount station next to the existing one if the two lines (Corridor 2 and 5) are connecting as they head into the existing St. Thomas mount station? I ask because I read that they will not be constructing a new St.Thomas mount station for Phase-2. If that is the case, what are those pillars being constructed next to the existing St. Thomas mount station for? Anyone?
@joobypaul29132 ай бұрын
Nice
@City_Breeze-12 ай бұрын
Thanks.🙏
@Mdnamis122 ай бұрын
Is there track shift from alandur to stm for both L2,L5, and existing station for L5 and newly constructed for L2?
@City_Breeze-12 ай бұрын
Yes. there will be a track shift . Thanks.
@gokulshanmugam3144Ай бұрын
bro why line 5 is not connect in existing stmount railway station and why build it the new staton in parallel..,if they connecgt existing station the new station cost is saved and easy to connection when the same strech to sollingallur to centrel it easy to pasengers
@mbala81482 ай бұрын
nice😎😎👍👍
@City_Breeze-12 ай бұрын
Thank you.🙏
@arunprakash11732 ай бұрын
Line 5 is not crossing only over the flights taking off in meenambakkam airport😂
@City_Breeze-12 ай бұрын
Thank you.
@v.m.samuvel2 ай бұрын
Chennai metro..❤ சென்னை மெட்ரோ திட்டத்திற்கு ஒப்புதல் அளித்துள்ளது. சென்னை மெட்ரோவின் தந்தை. MK Stalin. Chief minister of Tamil Nadu.. good thinking😅😅😅😅😅❤